2024-06-18 |
2024-170 |
21:18:00 |
HOSC maintenance turned off our GSE and H&S packets for a bit around 21:18 |
2024-06-15 |
2024-167 |
14:13:12 |
Commanded look-away from CST-100 thruster hot fire testing from 24-167-14:13:12 through 2024-167-15:57:09. |
2024-06-11 |
2024-163 |
00:37:16 |
Star tracker imaging was stuck from 24-163-00:37:16.642 through 24-163-01:00:27. Reset the star tracker at 24-163-01:00:27. |
2024-06-08 |
2024-160 |
23:05:00 |
US OPM to pXVV with Timeliner Profile 12 (M24_160_B_03.UAF) |
2024-06-07 |
2024-159 |
23:52:00 |
US OPM to nXVV with Timeliner Profile 4 (M24_159_D_03.UAF) |
2024-06-06 |
2024-158 |
16:58:09 |
Commanded NICER to AZ=-45deg and EL=90deg for CST100 docking from 24-158-16:58:09 through 2024-158-17:51:00\nPerformed Flash Memory TMR checks. boot2.bin had voting errors and was replaced with a fresh copy.\nUpdated EOPs and Reset clock bias at 18:08:54 |
2024-06-06 |
2024-158 |
13:35:00 |
CST100 Docking (CFT to PMA2) (M24_158_A_05.UAF) |
2024-06-02 |
2024-154 |
01:34:14 |
A NICER processor reset was detected at 24-154-01:34:14.000z based on an exception in VxWorks task tXbdService.\nThe HOSC confirmed and reported a dropout (01:35:37- 01:37:25) in our Health & Status consistent with NICER PAR NICER-SW-0001.\nTotal Science Downtime: 24-154-01:34:14.000z to 24-154-03:56:28z. (2.37 hours) |
2024-06-01 |
2024-153 |
23:44:00 |
RS OPM pXVV Profile 11 (M24_153_B_06.UAF) |
2024-05-31 |
2024-152 |
23:00:00 |
RS OPM nXVV Profile 2 (M24_152_A_06.UAF) |
2024-05-25 |
2024-146 |
06:11:00 |
OPM to pXVV with Timeliner Profile 11 (M24_146_A_05.UAF) |
2024-05-24 |
2024-145 |
00:47:00 |
OPM to nXVV with Timeliner Profile 3 (M24_144_A_05.UAF) |
2024-05-13 |
2024-134 |
01:00:00 |
CMG Maneuver to Stage TEA (M24_134_A_05.UAF) |
2024-05-09 |
2024-130 |
19:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M24_130_A_06.UAF) |
2024-05-08 |
2024-129 |
09:37:10 |
Star tracker imaging got stuck at 24-129-09:37:10. Reset star tracker at 24-129-13:04:30. |
2024-05-05 |
2024-125 |
23:03:14 |
Reset the Star tracker – imaging stuck since 24-125-23:03:14.679. ST recovered at 24-126-21:38:54. |
2024-05-05 |
2024-125 |
23:45:00 |
GEONS diverged at 24-125-23:45:04.000. Updated EOPs and Reset GEONS clock state bias. GEONS converged at 24-126-21:39:57.000. |
2024-05-03 |
2024-124 |
10:02:00 |
Updated EOPs and Reset GEONS Clock Bias twice because GEONS not happy - update and reset at 15:13:33 and 20:47:36 |
2024-05-03 |
2024-124 |
00:45:00 |
ROBO Ops: WO Lab until 124-03:45 |
2024-05-02 |
2024-123 |
21:45:00 |
ROBO Ops: MT Xlate WS2>WS4 until 124-00:45 |
2024-05-02 |
2024-123 |
12:29:00 |
Dragon Port Relocate Crew-8 from N2F to N2Z |
2024-05-02 |
2024-123 |
11:20:01 |
Crew-8 Relocation originally scheduled at 24-123-11:40 slipped until 12:30. As a result of the slipping, science plan interrupted from 2024-123-11:20:01 through 24-123-11:31:18, at which time we resumed the science plan while waiting for the slip.\nScience plan paused and look-away started at 2024-123-12:39:59.\nCrew-8 undocked N2F at 24-123-12:57.\nCrew-8 docked at N2Z at 24-123-13:38.\nScience plan was resumed at 24-123-14:01. |
2024-04-29 |
2024-120 |
15:50:00 |
ROBO: Parked: TBD\nMT - WS 2, SSRMS B on MBS 3\nSR = +180.0, +2.0, -105.0, -70.0, -90.0, +90.0, -55.0 = WR\nSPDM on MBS 2: BR = +60.0, EOTP = -90, body holding Stow\nSR1 = -50.00, -40.00, +80.00, +30.00, -80.00, -120.00, -50.00 = WR1\nSR2 = -120.00, -40.00, -80.00, -60.00, +40.00, -120.00, -20.00 = WR2\nuntil 123-21:45 |
2024-04-29 |
2024-120 |
14:50:00 |
ROBO Ops: Ops: I71 MNVR Crew-8 Relocate LIDAR Clear until 120-15:50 |
2024-04-28 |
2024-119 |
16:40:00 |
NICER commanded via load to look a little aft of starboard for the SpX-30 undock which occurred at 119:17:00. Science plan interrupted from 2024-119-16:40:00 through 2024-119-17:22:00. |
2024-04-28 |
2024-119 |
16:30:00 |
Cargo Dragon Undocking (SpX-30 from N2Z) (M24_119_A_03.UAF) |
2024-04-25 |
2024-116 |
21:20:01 |
NICER commanded to look a little aft of starboard for the SpX-30 and Crew 8 thruster testing which occurred from 21:30 through 23:00. Science plan interrupted from 24-116-21:20:01 to 2024-116-22:49:40. |
2024-04-25 |
2024-116 |
13:10:00 |
RS EVA 62 on US Control (M24_116_A_03.UAF) |
2024-04-23 |
2024-114 |
13:05:00 |
ROBO Ops: Maneuver to SpX30 Undock Clear until 19:30 |
2024-04-23 |
2024-114 |
13:05:00 |
ROBO Ops: DWO N2, Xlate 4>2 until 114:23:55 |
2024-04-19 |
2024-110 |
04:41:49 |
NICER safe due to low number of GPS signals. Science plan interrupted from 24-110-04:41:49 - 24-110-07:08:10. |
2024-04-19 |
2024-110 |
12:20:07 |
NICER safe due to low number of GPS signals. Science plan interrupted from 24-110-12:20:07 - 24-110-12:30:03.\nAfter this second safe, we set Action Point 49 to PASSIVE, so that it would complain about failure but not trigger the RTS to Safe. |
2024-04-18 |
2024-109 |
16:30:28 |
Updated EOPs and Reset GEONS Clock Bias |
2024-04-18 |
2024-109 |
00:20:00 |
ROBO Parked: TPS Inspection - Starboard Overnight Park\nMT - WS 4, SSRMS B on MBS 3\nSR = +229.9, +101.2, -74.2, -113.2, -105.8, +6.0, -151.5 = WR\nSPDM on MBS 2: BR = +60.0, EOTP = -90, body holding Stow\nSR1 = -50.00, -40.00, +80.00, +30.00, -80.00, -120.00, -50.00 = WR1\nSR2 = -120.00, -40.00, -80.00, -60.00, +40.00, -120.00, -20.00 = WR2 until 109-13:20 |
2024-04-17 |
2024-108 |
13:55:00 |
ROBO Ops: SPDM Stow, Xlate 2>4, TPS Inspection Day 1 (FS) until 109-00:20 |
2024-04-16 |
2024-107 |
12:50:00 |
ROBO Ops: Xlate 3>2, RELL Setup, RELL Checkout until 108-4:00 |
2024-04-06 |
2024-097 |
03:21:00 |
Soyuz Undocking on CMG Control (70S from MRM1) (M24_097_A_05.UAF) |
2024-04-03 |
2024-094 |
12:50:00 |
ROBO: Ops: Xlate 7>3, RMCT Unstow, STP-H7 Setup Until 094-23:30 |
2024-04-02 |
2024-093 |
13:45:00 |
ROBO Ops MISSE Day 4 Until 094-01:00 |
2024-04-02 |
2024-093 |
00:51:37 |
Re-deployed NICER post ROBO MISSE Ops Day 4\nBackground data collection stopped at 24-093-00:27:35 z.\nScience plan started at 24-093-00:51:37z. |
2024-04-01 |
2024-092 |
13:30:00 |
ROBO Ops MISSE Day 3 Until 093-06:10 |
2024-04-01 |
2024-092 |
12:10:11 |
Stowed NICER for ROBO MISSE Ops Day 4\nScience plan stopped at 24-092-12:10:11z.\nBackground data collection started at 24-092-13:13:45z. |
2024-04-01 |
2024-092 |
08:45:00 |
70S Thruster Test on MM (M24_092_B_03.UAF) |
2024-03-31 |
2024-091 |
11:23:00 |
Re-deployed NICER after ROBO MISSE Ops (SpX-30) Day 1/2/3.\nBackground data collection stopped at 24-091-10:33:34z.\nScience resumed at 24-091-11:23:00z. |
2024-03-29 |
2024-089 |
12:11:40 |
Stowed NICER for ROBO MISSE Ops Day 1/2/3 JOTI Extrct, Translate to WS2, Xfers)\nScience plan stopped at 24-089-12:11:40z.\nBackground data collection started at 24-089-12:56:28z. |
2024-03-29 |
2024-089 |
13:30:00 |
ROBO Ops MISSE Day 1/2 Until 091-13:05 |
2024-03-28 |
2024-088 |
13:20:00 |
ROBO Ops MISSE Setup until 088-19:20 |
2024-03-27 |
2024-087 |
02:37:15 |
Re-deployed NICER after ROBO Ops: SpX-30 Day 3 (MBSU FSE Stow ELC-2 Site 4, PM Unstow N2Z Dragon Trunk)\nBackground data collection stopped at 24-087-02:14:24z.\nScience plan resumed at 24-087-02:37:15z. |
2024-03-26 |
2024-086 |
11:20:00 |
ROBO Ops SpX-30 Day 3 Until 087-05:50 |
2024-03-26 |
2024-086 |
09:58:01 |
Stowed NICER for ROBO Ops: SpX-30 Day 3 (MBSU FSE Stow ELC-2 Site 4, PM Unstow N2Z Dragon Trunk)\nScience plan stopped at 24-086-09:58:01.\nBackground data collection started at 24-086-10:33:53. |
2024-03-26 |
2024-086 |
02:35:00 |
RS OPM to pXVV Profile 12 (H24_086_B_03.UAF) |
2024-03-25 |
2024-085 |
10:13:00 |
71S 34orbit Docking to RSNode nadir (H24_085_B_03.UAF) |
2024-03-25 |
2024-085 |
01:58:00 |
RS OPM to nXVV Profile 5 (H24_084_A_03.UAF) |
2024-03-23 |
2024-083 |
10:56:01 |
Look-away commanding included in load for 2024-083-10:56:01 - 2024-083-11:36:01 for SpX-30 docking. Science plan interrupted during this time. |
2024-03-23 |
2024-083 |
09:35:00 |
Cargo Dragon Docking (SpX-30 to N2Z) (M24_083_A_08.UAF) |
2024-03-22 |
2024-082 |
04:00:00 |
RS OPM to pXVV Profile 14 (H24_082_A_13.UAF) |
2024-03-21 |
2024-081 |
03:26:00 |
RS OPM to nXVV Profile 6 (H24_081_B_07.UAF) |
2024-03-20 |
2024-080 |
15:56:08 |
Re-deployed NICER post SPDM LDU, MBSU ESP3 to ELC2 Site Transfers.\nBackground data collection stopped at 24-080-15:17:51z.\nScience resumed at 24-080-15:56:08z. |
2024-03-19 |
2024-079 |
11:49:04 |
Stowed NICER for SPDM LDU, MBSU ESP3 to ELC2 Site Transfers. Science stopped at 24-079-11:49:04.\nBackground data collection started at 24-079-12:31:38. |
2024-03-19 |
2024-079 |
12:00:00 |
ROBO Ops SpX-30 Day 2 Until 080-07:00 |
2024-03-13 |
2024-073 |
14:30:00 |
ROBO arm possibly in NICER FOV until 080-07:00 Ops: Xlate WS4 > WS2, SPDM_Unstow_Spx30_Setup \nParked: Xlate WS4 > WS2, SPDM_Unstow_Spx30_Setup\nMT - WS 2, SSRMS B on MBS 3, holding SPDM (GC)\nSR = -237.0, +75.0, -112.0, -159.0, +57.0, +3.0, +66.0 = WR\nSPDM on SSRMS: BR = -163.0, EOTP = -90\nSR1 = +84.00, +58.00, -90.00, +108.00, +13.00, -10.00, -153.00 = WR1\nSR2 = -55.00, -75.00, +55.00, -100.00, -20.00, -10.00, -25.00 = WR2 |
2024-03-11 |
2024-071 |
14:45:00 |
Pointed NICER a little aft of starboard for the Crew-7 undock at the following times:\n2024-071-14:45:00 through 2024-071-15:34:20 |
2024-03-11 |
2024-071 |
14:30:00 |
Crew Dragon Undocking (Crew-7 from N2Z) (M24_071_A_05.UAF) Physical sep at 15:15 |
2024-03-11 |
2024-071 |
18:54:50 |
Updated EOPs and Reset GEONS Clock Bias |
2024-03-10 |
2024-070 |
18:10:00 |
Crew-7 thruster test occurred today. Thrusting timeline per OC was 18:10z - pulses every three minutes. 3 sets complete by 18:20. However, NICER was looking away only from 2024-070-17:10:00 through 024-070-17:52:59. |
2024-03-07 |
2024-067 |
17:45:14 |
Created and uplinked RTS 152 and 153 for special detector configuration for TargetID 7160 and 5414\nTarget ID 7160 and 5414 The following detectors are disabled for these targets:\n1-8 2-8 4-8 6-8\n1-7 2-6 3-8 4-7 5-8\n4-5\n2-4 5-5\n2-3 4-3 5-4 6-3 7-7\n2-2 3-3 5-3\n2-1 7-2\n1-1 3-1 7-1 |
2024-03-05 |
2024-065 |
14:30:00 |
ROBO arm possibly in NICER FOV until 22:00 Ops: I70_SPDM_LEE_SURVEY |
2024-03-05 |
2024-065 |
05:53:00 |
Dragon Docking (Crew-8 to N2F) (M24_065_B_03.UAF) Soft Capture at 07:28 |
2024-03-05 |
2024-065 |
07:08:00 |
Added commanding to point NICER a little aft of starboard for Crew-8 docking from 24-065-07:08:00 through 2024-065-07:47:20. |
2024-02-28 |
2024-059 |
10:56:44 |
NICER Star tracker Imaging stuck until Star tracker was reset at 24-059-13:50:06 |
2024-02-23 |
2024-054 |
18:24:36 |
NICER Star tracker Imaging stuck until Star tracker was reset at 24-057-14:59:46 |
2024-02-21 |
2024-052 |
17:48:58 |
Performed NICER memory TMR checks. Operation was performed until 24-052-19:37:00. Possible science data gaps can be expected at these times. |
2024-02-16 |
2024-047 |
13:44:00 |
Commanded NICER Flash memory "bad" file deletions - commanding continued until 16:50:07 |
2024-02-15 |
2024-046 |
13:22:24 |
Commanded NICER Flash memory "bad" file deletions - commanding continued until 20:05 |
2024-02-08 |
2024-039 |
19:27:00 |
Updated EOPs and Reset GEONS Clock Bias |
2024-02-07 |
2024-038 |
13:30:00 |
Crew Dragon Undocking (Ax-3 from N2F) (M24_038_A_03.UAF) Physical sep at 038/14:05 |
2024-02-07 |
2024-038 |
14:04:00 |
Commanded in real-time NICER look-away from AX-3 departure from N2F port. NICER science plan interrupted from 23-038-24-038-14:04:00 through 24-038-14:35:44. |
2024-01-31 |
2024-031 |
16:44:08 |
Included in load commanding to point NICER XTI to EL=90, AZ=-45 from NICER science plan interrupted for AX-3 thruster firings from 24-031-16:44:08z to 24-031-17:39:48. |
2024-01-20 |
2024-020 |
10:24:02 |
Added commanding to load to have NICER look -45AZ, 90EL during AX-3 docking at N2F from 2024-020-10:24:02z to 2024-020-11:17:40z. Docking targeted for 10:44-10:57z. |
2024-01-20 |
2024-020 |
09:02:00 |
Crew Dragon Docking (Ax-3 to N2F) (M24_020_A_06.UAF) |
2024-01-11 |
2024-011 |
17:48:00 |
Performed NICER memory TMR checks. Boot2, boot3 and spare were corrupt. Renamed and replaced them. Operation was performed from 24-011-17:48:16 to 24-011-18:31:52 and from 24-011-19:21:28 to 24-011-19:56:26. Possible science data gaps can be expected at these times. |
2024-01-10 |
2024-010 |
22:33:00 |
Modified ATTILA so that TARGETID 5406 (Cen A) now uses the regular night time detector RTSs. |
2024-01-08 |
2024-008 |
20:42:39 |
Updated EOPs and Reset GEONS Clock Bias |
2024-01-08 |
2024-008 |
16:05:49 |
Modified ATTILA to use the normal night detector configuration for TARGETID = 5394 Swift J1727 |
2023-12-21 |
2023-355 |
21:50:00 |
Commanded NICER to look starboard, away from SpX-29 undocking from 23-355-21:50 - 22:20. |
2023-12-21 |
2023-355 |
21:30:00 |
Cargo Dragon Undocking (SpX-29 from N2F) (M23_355_R_06.UAF) Physical sep at 22:05:00 |
2023-12-14 |
2023-348 |
11:00:00 |
CMG Maneuver to Stage TEA (M23_348_A_05.UAF) |
2023-12-09 |
2023-343 |
00:01:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M23_343_A_03.UAF) |
2023-12-06 |
2023-340 |
16:27:00 |
Added commanding to the load on DOY 23-340-16:27 to point starboard during the SpX-29 pre-departure thruster fire testing until 17:00:00 |
2023-12-06 |
2023-340 |
13:15:56 |
Updated EOPs and Reset GEONS Clock Bias |
2023-12-04 |
2023-338 |
16:50:33 |
Turned detector 7-4 back on to take a look at how the annealing was going at 23-338-16:50:33. Turned it back off again for the day at 23-338-17:05:39. |
2023-12-03 |
2023-337 |
09:05:00 |
86P Docking MRM2 34 orbit (M23_337_R_08.UAF) Docking at 11:14:52 |
2023-12-03 |
2023-337 |
11:00:36 |
Added commands to load to point NICER starboard from 23-337-11:00:36 – 11:28:00 for 86P docking at MRM2 |
2023-12-01 |
2023-335 |
19:50:23 |
Turned on TEC and HV for Detector 6-6, to see if it was viable. TEC on at 23-335-19:50:23 and HV on at 23-335-19:52:15.\n6-6 not looking good, so TEC and HV off at 23-335-20:44:43.\nExisting Temp Setpoint = 1024\nExisting HV Output = 3020\nDisabled detector 6-6 at 23-335-20:47:50.\nBegan annealing detector 7-4. Disabled detector at 23-335-20:47:50, TEC and HV off at 23-335-20:45:40.\nExisting Temp Setpoint = 1024\nExisting HV Output = 3020\nRTS 25 updated to change it from a noop to detector disable 6-6 and 7-4. |
2023-11-20 |
2023-324 |
19:00:00 |
NICER FSW - Changed Action Point 48 and 49 max fails to 12000 (20 mins) from 7000 (13 mins). Trying to keep GPS jamming safes from occurring as frequently. |
2023-11-18 |
2023-322 |
18:16:53 |
NICER safe due to low number of GPS signals. Science plan interrupted from 32-322-18:16:53 - 18:35:04. |
2023-11-17 |
2023-321 |
10:36:54 |
Star Tracker Imaging got stuck at 23-321-10:36:54.351z. Reset the star tracker at 23-321-14:39:34z. |
2023-11-16 |
2023-320 |
18:14:57 |
NICER safe due to low number of GPS signals. Science plan interrupted from 32-320-18:14:57 – 18:41:44. |
2023-11-14 |
2023-318 |
09:31:22 |
Star tracker imaging got stuck at 23-318-09:31:22.718z. Reset the star tracker to fix issue at 23-318-14:08:41z. |
2023-11-11 |
2023-315 |
10:10:00 |
Added commands to load to point NICER starboard from 23-315-10:10 – 10:40 for SpX-29 docking at N2F. |
2023-11-11 |
2023-315 |
08:20:00 |
Cargo Dragon Docking (SpX-29 to N2F) (M23_315_A_03.UAF) |
2023-11-10 |
2023-314 |
13:57:00 |
PDAM - Aft Progress - MLM Roll (M23_314_B_04.UAF) |
2023-11-07 |
2023-311 |
20:50:00 |
Updated EOPs and Reset GEONS Clock Bias |
2023-11-03 |
2023-307 |
23:50:53 |
NICER Safe at 23-307-23:50:53z due to WP=32, AP=48 trip (GPS Data Invalid, GPS signals dropped out prior). NICER back collecting science at 23-308-00:07z. |
2023-11-02 |
2023-306 |
03:04:06 |
NICER Safe at 23-306-03:04:06z due to AP=49 trip (GPS Data Invalid, GPS jamming). NICER back collecting science at 23-306-03:50. |
2023-10-28 |
2023-301 |
05:28:33 |
NICER Safe at 23-301-05:28:33z due to AP=49 trip (GPS Data Invalid – GPS jamming). NICER back collecting science at 23-301-06:26:25z. |
2023-10-10 |
2023-283 |
16:07:00 |
ISS MLM-Nauka Russian Module coolant leak from the radiator almost completely stopped. Only residual coolant flaking off from external bubble occasionally.\nRestarted the science plan at 23-283-16:07. |
2023-10-09 |
2023-282 |
16:58:00 |
ISS MLM-Nauka Russian Module started leaking coolant from a radiator at ~ 282-16:58z. NICER team received email at 17:26z informing us of the leak. OC on voice loop said she thought the leak was coming from the AFT side and was moving forward. |
2023-10-09 |
2023-282 |
17:34:16 |
Due to MLM coolant leak, Stopped the science plan at 23-282-17:34:16 and commanded NICER to AZ=180, EL=90. |
2023-10-09 |
2023-282 |
18:10:00 |
Updating the safe position for the ongoing MLM coolant leak. Commanded NICER to AZ=45, EL=100 at 23-282-18:10:00. |
2023-10-08 |
2023-281 |
22:07:28 |
Star tracker imaging stuck at 23-281-11:10:39.318. Reset at 23-281-22:07:28. |
2023-10-08 |
2023-281 |
21:22:49 |
GEONS Diverged 23-281-11:49:59. Reset performed at 23-281-21:22:49. |
2023-10-06 |
2023-279 |
13:48:10 |
NICER GEONS Diverged since at least 23-279-10:45:19. Reloaded EOPS and reset GEONS |
2023-10-03 |
2023-276 |
12:51:03 |
NICER GEONS Diverged since at least 23-276-06:24:10. Reloaded EOPS and reset GEONS |
2023-10-02 |
2023-275 |
15:24:02 |
Uploaded RTS 11 (version 05) to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-09-28 |
2023-271 |
02:40:31 |
Deployed NICER post ROBO/MISSE operations - Day #3. NICER science plan resumed at 23-271-02:40:31. |
2023-09-27 |
2023-270 |
12:51:12 |
Stowed NICER for ROBO/MISSE operations - Day #3. NICER science plan stopped at 23-270-12:51:12. |
2023-09-27 |
2023-270 |
03:48:22 |
Deployed NICER post ROBO/MISSE operations - Day #2. NICER science plan resumed at 23-270-03:48:22. |
2023-09-26 |
2023-269 |
12:34:18 |
Stowed NICER for ROBO/MISSE operations - Day #2. NICER science plan stopped at 23-269-12:34:18. |
2023-09-26 |
2023-269 |
09:17:45 |
Deployed NICER post ROBO/MISSE operations - Day #1. NICER science plan resumed at 23-269-09:17:45. |
2023-09-25 |
2023-268 |
12:13:11 |
Stowed NICER for ROBO/MISSE operations - Day #1. NICER science plan stopped at 23-268-12:13:11. |
2023-09-23 |
2023-266 |
16:12:03 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 6-2, 7-7 |
2023-09-19 |
2023-262 |
13:03:12 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 2-3, 3-6, 4-2, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7 |
2023-09-18 |
2023-261 |
09:13:08 |
NICER GEONS Diverged since at least 23-261-08:35:05. Reloaded EOPS and reset GEONS |
2023-09-16 |
2023-259 |
06:29:00 |
RS OPM to pXVV Profile 11 (H23_259_A_03.UAF) |
2023-09-15 |
2023-258 |
05:39:00 |
RS OPM to nXVV Profile 3 (H23_258_B_03.UAF) |
2023-09-13 |
2023-256 |
13:20:05 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150, 7117, 7116 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 6-1, 6-2, 7-3, 7-7 |
2023-09-03 |
2023-246 |
10:40:00 |
Crew Dragon Undocking (Crew-6 from N2F) (M23_246_A_03.UAF) |
2023-09-03 |
2023-246 |
10:35:57 |
Crew-6 Undock from N2F at 11:05z. NICER looked starboard from 2023-246-10:35:57 to 23-246-11:31:35. |
2023-09-01 |
2023-244 |
17:15:00 |
Modified running ATS to include look starboard away from Crew-6 Dragon Thruster Test. Science plan was interrupted from 2023-244-17:15:00 to 2023-244-17:56:40. |
2023-08-30 |
2023-242 |
19:02:57 |
Fixed the NICER load building process to remove detector enable alls that were happening in day/night transitions accidentally during the RTS11 bright targets. |
2023-08-30 |
2023-242 |
16:13:36 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 2-3, 2-7, 3-6, 3-7, 4-2, 4-6, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-08-28 |
2023-240 |
19:49:55 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394, 7098, 7150 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4, 7-3 , 7-5, 7-7 |
2023-08-28 |
2023-240 |
13:51:53 |
Updated EOPs and Reset GEONS Clock Bias |
2023-08-28 |
2023-240 |
00:47:00 |
Uploaded to NICER RTS 11 to enable detectors for ID 5394 in the following config:\n1-4, 1-7, 1-8, 2-3, 2-7, 2-8, 3-4, 3-6, 3-7, 4-2, 4-6, 4-8, 5-1, 5-2, 5-6, 6-1, 6-2, 6-4 |
2023-08-27 |
2023-239 |
12:05:40 |
Commanded NICER to look starboard from 2023-239-12:05:40 to 2023-239-12:59:01 for Dragon Docking (Crew-7 to N2Z) |
2023-08-27 |
2023-239 |
11:34:00 |
Dragon Docking (Crew-7 to N2Z) (M23_239_B_02.UAF) |
2023-08-25 |
2023-237 |
23:25:46 |
Uploaded to NICER RTS 10,11 disable and enable detectors for ID 5394 in the following config\n1-2, 1-3, 2-1, 2-5, 2-6, 3-8, 4-3, 4-4, 5-4, 5-7, 5-8, 6-5, 6-7, 6-8 |
2023-08-24 |
2023-236 |
08:41:22 |
NICER Safe at 23-236-08:41:22z due to AP=49 trip (GPS Data Invalid - GPS jamming). NICER back collecting science at 23-236-09:10:37z. |
2023-08-24 |
2023-236 |
16:27:00 |
RS OPM to pXVV (M23_236_B_04.UAF) |
2023-08-24 |
2023-236 |
13:56:00 |
PDAM - SM ME - MLM Roll (M23_236_A_02.UAF) |
2023-08-12 |
2023-224 |
05:24:00 |
US OPM to pXVV with Timeliner Profile 13 (M23_224_A_05.UAF) |
2023-08-10 |
2023-222 |
05:23:12 |
Performed GEONS reset after GPS reporting non-convergence |
2023-08-10 |
2023-222 |
23:57:00 |
US OPM to nXVV with Timeliner Profile 5 (M23_222_A_07.UAF) |
2023-08-06 |
2023-218 |
00:55:00 |
PDAM - Aft Progress - MLM Roll (M23_217_B_06.UAF) |
2023-08-04 |
2023-216 |
11:54:00 |
Cygnus19 Install (M23_216_A_03.UAF) |
2023-08-04 |
2023-216 |
07:50:00 |
Cygnus19 Capture (M23_215_A_03.UAF) |
2023-08-03 |
2023-215 |
15:49:37 |
NICER entered SAFE mode at 23-215-15:49:37 due to GPS signal jamming. AP 49 tripped after ten minutes of invalid GPS data. Safe occurred during long TDRSS outage. NICER was recovered as soon as TDRSS was available. Science plan was resumed at 23-215-16:47:27. |
2023-08-01 |
2023-213 |
08:19:13 |
Power issues on ISS made POIC turn off our survival heaters at 23-213-08:19:13z. They were turned back on at 23-213-11:21ishz |
2023-07-31 |
2023-212 |
15:46:31 |
Pointed NICER at the MRM-2 FWD/STBD Window for Photo Survey. Science plan interrupted from 23-212-15:46:31 - 2023-212-16:32:19. |
2023-07-25 |
2023-206 |
20:16:00 |
Tried looking at the MRM-2 window twice and taking photos to see if we are pointed at the window.\nScience plan interrupted from 23-206-20:16:07 to 23-206-20:38:41. – Nothing seen on ST images\nScience plan interrupted from 23-207-00:44:05 to 23-207-01:13:47. – ST images a success. |
2023-07-25 |
2023-206 |
15:55:00 |
Star tracker Imaging was stuck. Reset the star tracker. Images not taken from 23-206-12:27:35.056 – 23-206-15:55:09. |
2023-07-24 |
2023-205 |
15:40:00 |
There was an APS-1 Outage on the ISS from about 205/15:40 – 17:40. This caused NICER data not to be routed and also not to be recorded on the ISS. |
2023-07-20 |
2023-201 |
17:09:53 |
Updated EOPs and Reset GEONS Clock Bias |
2023-07-09 |
2023-190 |
19:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude Mom Ramp First Use (M23_190_A_03.UAF) |
2023-07-06 |
2023-187 |
13:16:15 |
Reset the star tracker. Imaging was stuck from 23-186-22:03:51 - 23-187-13:16:15. |
2023-06-29 |
2023-180 |
16:20:00 |
Updated the ATS to look AZ = -45deg, El=88 deg during the SpX-28 Undock to avoid debris/contam.\nScience plan interrupted from 2023-180-16:20:00 to 23-180-16:44:00 |
2023-06-29 |
2023-180 |
15:30:00 |
Cargo Dragon Undocking (SpX-28 from N2Z) (M23_180_A_03.UAF) |
2023-06-27 |
2023-178 |
16:43:41 |
SpX-28 is performing a hot-fire thruster test from 16:55 – 17:55z today. Updated the ATS to look AZ = -45deg, El=88 deg during the 2023-178-16:43:41z to 2023-178-18:04:20z, to avoid the plume. Test ended early so manually commanded back to nominal science. Science plan interrupted from 23-178-16:43:40 to 23-178-17:42:58. |
2023-06-15 |
2023-166 |
09:57:00 |
IROSA 1B Install EVA (M23_166_A_05.UAF) |
2023-06-13 |
2023-164 |
19:49:08 |
Pointed NICER in the direction of ISS EHDC1 and EHDC7 cameras and CRONUS took video and stills.\nScience plan interrupted from 23-164-19:49:08z to 23-164-21:00:12z. |
2023-06-12 |
2023-163 |
20:59:44 |
Updated EOPs and Reset GEONS Clock Bias |
2023-06-09 |
2023-160 |
20:40:19 |
Maneuvered NICER to look at ISS camera for High Def video survey. Science Plan interrupted from 23-160-20:40:19 to 23-160-22:29:45. |
2023-06-09 |
2023-160 |
09:07:00 |
IROSA 1A Install EVA (M23_160_A_07.UAF) |
2023-06-06 |
2023-157 |
19:36:31 |
Loaded NICER FSW RTSs 224 - 227 (version 4) which adjust the nominal MPU threshold settings by +35 from nominal. Ran them at 19:36:31 |
2023-06-06 |
2023-157 |
09:50:00 |
Cargo Dragon Docking (SpX-28 to N2Z) (M23_157_B_03.UAF) |
2023-06-06 |
2023-157 |
09:14:53 |
Added commands to load to look port side during SpX-28 157-09:50:00 dock. Science plan interrupted from 23-157-09:14:53 to 23-157-10:10:00. |
2023-06-02 |
2023-153 |
14:55:54 |
Loaded NICER FSW RTSs 224 - 227 (version 3) which adjust the nominal MPU threshold settings by +30 from nominal. Ran them at 14:55:54 |
2023-06-01 |
2023-152 |
14:00:55 |
Loaded NICER FSW RTSs 224 - 227 (version 2) which adjust the nominal MPU threshold settings by 50. Ran them at 14:06:56. |
2023-06-01 |
2023-152 |
14:51:03 |
Tested NICER FSW RTSs 220-223 which command the MPU thresholds back to nominal settings. |
2023-06-01 |
2023-152 |
00:29:47 |
Adjusted MPU detector threshold settings by 50 counts from nominal. |
2023-06-01 |
2023-152 |
15:40:37 |
Started NICER FSW RTSs 224-227 which adjust the nominal MPU threshold settings by 50. |
2023-06-01 |
2023-152 |
20:34:48 |
Modified the NICER ATS load builder to use the day crossing to call RTS 224-227 to set MPU threshold settings to nominal + 50 and to call RTS 220-223 at night crossing to set thresholds back to nominal values. |
2023-05-31 |
2023-151 |
23:19:10 |
Adjusted MPU detector threshold settings by 100 counts from nominal. |
2023-05-31 |
2023-151 |
22:10:45 |
Adjusted MPU detector threshold settings by 140 counts from nominal. |
2023-05-31 |
2023-151 |
21:19:23 |
Adjusted MPU detector threshold settings by 230 counts from nominal. |
2023-05-30 |
2023-150 |
22:32:00 |
Modified the ATS load builder to re-enable the detectors after transitioning from day to night if target spanned across the boundary. |
2023-05-30 |
2023-150 |
18:57:32 |
Pointed NICER head at an external ISS camera that had been looking at MISSE. Science plan interrupted until 19:12:47 |
2023-05-30 |
2023-150 |
15:03:19 |
Pointed NICER head away from AX-2 undocking. Science plan interrupted until 15:15:56 |
2023-05-30 |
2023-150 |
14:27:00 |
Crew Dragon Undocking (Ax-2 from N2Z) (M23_150_A_03.UAF) |
2023-05-25 |
2023-145 |
15:45:00 |
ROBO Ops: I69 SPDM Stow and reconfigure for TPS Survey\nOps: Xlate from WS 2 to WS4\nIN NICER FOV possibly until 22:15 |
2023-05-25 |
2023-145 |
03:39:00 |
RS OPM to pXVV (M23_145_A_12.UAF) |
2023-05-24 |
2023-144 |
03:08:00 |
RS OPM to nXVV (H23_144_B_07.UAF) |
2023-05-22 |
2023-142 |
12:00:00 |
Dragon Docking (Ax-2 to N2Z) (M23_142_A_08.UAF) |
2023-05-22 |
2023-142 |
13:45:00 |
Start of NICER light leak |
2023-05-12 |
2023-132 |
12:51:11 |
Updated EOP and reset GEONS clock bias |
2023-05-11 |
2023-131 |
22:10:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M23_131_A_03.UAF) |
2023-05-06 |
2023-126 |
10:35:00 |
Dragon Port Relocate (Crew-6 from N2Z to N2F) (M23_126_A_05.UAF) |
2023-04-15 |
2023-105 |
14:27:00 |
Cargo Dragon Undocking (SpX-27 from N2F) (M23_105_A_03.UAF) |
2023-04-13 |
2023-103 |
15:52:00 |
SpX-27 Dedicated Thruster Firing Test (M23_103_A_08.UAF) |
2023-04-10 |
2023-100 |
00:15:28 |
Updated EOP and reset GEONS clock bias |
2023-04-04 |
2023-094 |
05:14:00 |
Deployed NICER post MISSE ROBO Operations Day 5 |
2023-04-04 |
2023-094 |
05:03:53 |
Updated EOP and reset GEONS clock bias |
2023-04-03 |
2023-093 |
03:54:40 |
Deployed NICER post MISSE ROBO Operations Day 4 |
2023-04-03 |
2023-093 |
03:41:48 |
Updated EOP and reset GEONS clock bias |
2023-04-03 |
2023-093 |
11:59:33 |
Stowed NICER for MISSE ROBO Operations Day 5 |
2023-04-02 |
2023-092 |
11:55:12 |
Stowed NICER for MISSE ROBO Operations Day 4 |
2023-04-02 |
2023-092 |
05:56:42 |
Deployed NICER post MISSE ROBO Operations Day 3 |
2023-04-02 |
2023-092 |
05:40:23 |
Updated EOP and reset GEONS clock bias |
2023-04-01 |
2023-091 |
11:59:13 |
Stowed NICER for MISSE ROBO Operations Day 3 |
2023-03-31 |
2023-090 |
19:44:00 |
US OPM to pXVV with Timeliner Profile 14 (M23_090_A_05.UAF) |
2023-03-29 |
2023-088 |
14:07:36 |
Deployed NICER post MISSE ROBO Operations Day 2 |
2023-03-29 |
2023-088 |
16:37:00 |
US OPM to nXVV with Timeliner Profile 6 (M23_088_A_03.UAF) |
2023-03-29 |
2023-088 |
14:13:28 |
Updated EOP and reset GEONS clock bias |
2023-03-28 |
2023-087 |
20:48:53 |
Stowed NICER for MISSE ROBO Operations Day 2 |
2023-03-28 |
2023-087 |
00:15:00 |
Deployed NICER post MISSE ROBO Operations Day 1 |
2023-03-28 |
2023-087 |
08:54:00 |
Soyuz Undocking on RS Control 68S from MRM1 (H23_087_R_07.UAF) |
2023-03-27 |
2023-086 |
23:54:49 |
Updated EOP and reset GEONS clock bias |
2023-03-27 |
2023-086 |
10:54:18 |
Stowed NICER for MISSE ROBO Operations Day 1 |
2023-03-16 |
2023-075 |
10:15:00 |
Dragon Docking (SpX-27 to N2F) (M23_075_A_07.UAF) |
2023-03-14 |
2023-073 |
10:44:00 |
PDAM Aft Progress MLM Roll (M23_073_A_02.UAF) |
2023-03-11 |
2023-070 |
06:41:00 |
Crew Dragon Undocking (Crew-5 from N2F) (M23_070_B_03.UAF) |
2023-03-08 |
2023-067 |
18:33:00 |
Uploaded updated versions of RTS 250 and 251 to disable subset of detectors at <70 degrees |
2023-03-07 |
2023-066 |
13:37:00 |
The target catalog had bad coordinates for the COMET and thus PC rejected the pointing command and NICER stopped until the next target was commanded from the load.\n\nNICER stopped from 23-066-13:37:17.721 to 23-066-14:12:43.621 |
2023-03-06 |
2023-065 |
11:32:00 |
GMT 065 PDAM Aft Progress MLM Roll (M23_065_E_03.UAF) |
2023-03-06 |
2023-065 |
05:15:00 |
During a comet observation we had the wrong coordinates for the target in the catalog.\n\nPC wouldn’t accept the target, so NICER stopped.\nNICER stopped from 05:15:59 to 05:32:03 |
2023-03-03 |
2023-062 |
04:25:00 |
Crew Dragon Docking (Crew-6 to N2Z) (M23_062_B_05.UAF) |
2023-03-01 |
2023-060 |
20:17:00 |
Changed MAX recorder file size for science files (index 1) to 20MB. (Trying to alleviate problem with data storage not disabling) |
2023-02-28 |
2023-059 |
15:54:00 |
Uploaded a modified RTS 243 to include disabling of 7-7, 2-3 and 2-6 at < 53 deg sun angle. |
2023-02-27 |
2023-058 |
17:37:00 |
Updated EOP and reset GEONS clock bias |
2023-02-26 |
2023-057 |
15:02:00 |
RS OPM to pXVV (H23_057_A_05.UAF) |
2023-02-25 |
2023-056 |
01:51:00 |
RS OPM to nXVV (H23_056_A_03.UAF) |
2023-02-25 |
2023-056 |
00:55:03 |
NICER Safe due to ISS maneuver (ISS maneuver action points were not disabled.)\n\nNICER Science downtime from 23-057-00:55:03 to 23-057-01:54:53. |
2023-02-21 |
2023-052 |
15:59:00 |
Added disable of detector 2-4 for sun angled less than 60 degrees. Uploaded RTS241_v09. |
2023-02-21 |
2023-052 |
14:24:00 |
Reset the star tracker due to stuck imaging. Unfortunately, commanded the reset during a BBO. :( Resulted in Safe Mode. Science interrupted from 23-052-14:24 – 23-052-14:26:42 |
2023-02-20 |
2023-051 |
15:38:00 |
Added detector 4-3 to the set of detectors that get disabled at low sun angles (RTS 241). Uplinked and enabled RTS 241 for this change. |
2023-02-18 |
2023-049 |
02:19:00 |
Disabled OHMAN TOO response (MAXI was giving overnight multiple triggers in a row which we think were false)\n\nUploaded an ATS in the A buffer that we will switch to from the load running in the B buffer 5 minutes prior to the 82P undock. ATS A will point the head away from the undock in case of contamination AZ=90deg, EL=88 deg. It will then switch back to the science ATS 3 hours later.\n\nWhen the load commanded the head to EL 88 deg it hit the softstop and tripped the EL fault. This had to be cleared before we could go back to science pointing.\n\nSCIENCE INTERRUPTED FROM 2023-049-02:19:00 UNTIL 23-049-03:47:54 |
2023-02-18 |
2023-049 |
22:42:00 |
RS OPM to pXVV (H23_050_B_03.UAF) |
2023-02-16 |
2023-047 |
14:36:00 |
Uplinked RTS rts242_02.dat so that detectors were disabled at low sun angles. -TURNS OUT THAT 242 was not the correct version on-board and was not turning off all the detectors.\n\nLoaded NICER V2_7_1_6 CCR #040 WP/AP updated for Data Storage Management and modified RTS 70 and RTS 244 to enable AP 111 and 110. |
2023-02-15 |
2023-046 |
20:36:00 |
Modified and uplinked RTS rts243_06.dat so that Detector 4-3 was disabled at low sun angles. Was playing around with detector configuration from 20:30 through 20:40. |
2023-02-15 |
2023-046 |
15:30:00 |
CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_046_A_03.UAF) |
2023-02-15 |
2023-046 |
15:00:00 |
NICER GSFC SPOCC SEN firewall reverted to previous since GSE packets weren't being received. |
2023-02-14 |
2023-045 |
15:00:00 |
NICER GSFC SPOCC firewall upgrade - GSE packets 603 and 611 not being received. |
2023-02-09 |
2023-040 |
04:09:44 |
NICER star tracker imaging stuck. ST reset at 13:56 |
2023-02-03 |
2023-034 |
19:50:00 |
CMG Maneuver to 68S Shadowing Yaw Bias Attitude (M23_034_B_03.UAF) |
2023-01-31 |
2023-031 |
17:12:00 |
Turned MPU 6-5 back on and then back off again. |
2023-01-31 |
2023-031 |
16:55:00 |
Ran the happy pill for MPU 7-4 |
2023-01-24 |
2023-024 |
18:07:46 |
MPU 6-6 detector annealing started |
2023-01-24 |
2023-024 |
17:20:00 |
Ops: MSS Uplink and Checkouts, SSRMS Motion Requred for Checkouts - ROBO in NIVER FOV until 1/25/2023 16:00 |
2023-01-23 |
2023-023 |
19:15:01 |
Updated EOP and reset GEONS clock bias |
2023-01-09 |
2023-009 |
21:33:00 |
Cargo Dragon Undocking (SpX-26 from N2Z) (M23_009_A_03.UAF) |
2023-01-04 |
2023-004 |
18:02:00 |
SpX-26 Dedicated Thruster Firing Test (M23_004_A_05.UAF) |
2023-01-04 |
2023-004 |
17:44:00 |
After ATS commanded NICER to a target change at 2023-004-17:44:00, the AZ motor failed to move the head again and NICER did not track the target. Operator noticed NICER was not tracking and enabled the sun angle violation APs that were still disabled from the morning safe, so that NICER would safe again, since cause of not being able to track was unknown at the time. Operator tried to move head in AZ direction again without success.\n\nEngineers (Alice and Gary) were called in and team was able to “unstick” the AZ by commanding multiple slower movements of the head in the AZ direction.\n\nScience was resumed at 23-004-22:25:48. |
2023-01-04 |
2023-004 |
10:53:27 |
NICER entered safe mode at FSW AP #66 (AZ Sun angle violation) tripped at 23-004-10:53:27.062. This due to sticky AZ motor not being able to move the head to the commanded target.\nOperator recovered to science collection at 23-004-12:18:40. |
2023-01-03 |
2023-003 |
03:32:00 |
NICER entered safe mode due to Action Point 48 FDC. Too few GPS signals. Alerting system was down, so operators didn’t see until around 13:00 at which time recovery commenced. Total Science downtime was from 23-003-03:32 until 23-003-13:37:38 |
2023-01-03 |
2024-003 |
21:12:17 |
Loaded RTS 150_v00 and 151_v00 and v01 to enable detectors for ID 5406 in the following config:\n1-1, 2-8, 4-1, 5-1, 6-1, 7-7. Spent some time from 20:53 to 21:07 trying different detector configurations for this targetid in real-time. |
2022-12-22 |
2022-356 |
11:08:00 |
US EVA IROSA 4A Install (M22_356_D_03.UAF) |
2022-12-21 |
2022-355 |
12:32:00 |
PDAM AftProgress MLM Roll (M22_355_E_02.UAF) |
2022-12-16 |
2022-350 |
20:15:10 |
Updated EOP and reset GEONS clock bias |
2022-12-15 |
2022-349 |
03:00:55 |
NICER safed due to ST attitude divergence either from debris moving through FOV or the star tracker imaging\nNICER's head was pointed away from the direction of the debris to aviod contamination.\nRussian EVA on 349 was scrubbed due to leak.\nScience target tracking was resumed at 18:03:15 |
2022-12-15 |
2022-349 |
01:00:00 |
At ~01:00UTC HOSC received a warning of low pressure in MRM-1 thermal control loop. Shortly after, a large amount of particulate was seen being released from the FGB Nadir Soyuz. Leaking substance is Isooctance or 2,2,4-Trimethylpentane. Leak was pluming in the forward direction, towards the US segment, and more starboard. |
2022-12-10 |
2022-344 |
14:08:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_344_A_05.UAF) |
2022-12-06 |
2022-340 |
15:00:00 |
HOSC turned on NICER survival heater after IROSA install |
2022-12-03 |
2022-337 |
10:37:00 |
US EVA IROSA 3A Install (M22_337_B_05.UAF) - Panel is on the starboard side of the ISS and near NICER |
2022-12-03 |
2022-337 |
07:00:00 |
HOSC Turned off NICER survival heater for IROSA install. |
2022-11-30 |
2022-334 |
20:30:00 |
ROBO Ops: SSRMS Mnvr, MT Translate WS 4>1, WO MBS 4, IROSA 3A EVA Setup until 335-03:00 |
2022-11-27 |
2022-331 |
10:45:00 |
Cargo Dragon Docking (SpX-26 to N2Z) (M22_331_A_03.UAF) |
2022-11-16 |
2022-320 |
03:17:15 |
OPM to pXVV with Timeliner Profile 14 (M22_320_A_05.UAF) |
2022-11-15 |
2022-319 |
19:30:00 |
ROBO Ops: Mnvr to Spx-26 Setup until 20:00 |
2022-11-14 |
2022-318 |
21:51:16 |
OPM to nXVV with Timeliner Profile 6 (M22_318_A_05.UAF) |
2022-11-08 |
2022-312 |
12:53:58 |
Updated EOP and reset GEONS clock bias - GEONS not converged |
2022-11-08 |
2022-312 |
23:35:17 |
Updated EOP and reset GEONS clock bias - GEONS not converged |
2022-11-07 |
2022-311 |
15:56:02 |
Reset NICER star tracker after noticing that imaging was stuck |
2022-11-02 |
2022-306 |
15:16:47 |
NICER in safe mode due to low sun angle constraint violation while slewing to TargetID=1970. NICER back collecting science at 15:23:51 |
2022-10-30 |
2022-303 |
11:08:38 |
MPU1 powered off due to SEU. Fully recovered at 22-303-14:04:10 |
2022-10-28 |
2022-301 |
14:27:00 |
RS OPM to pXVV (H22_301_B_03.UAF) |
2022-10-27 |
2022-300 |
15:12:00 |
RS OPM to nXVV (H22_300_A_05.UAF) |
2022-10-24 |
2022-297 |
23:15:00 |
PDAM Aft Progress 81P MLM Roll (M22_297_B_03.UAF) |
2022-10-17 |
2022-290 |
18:17:00 |
PDAM Aft Progress MLM Roll (M22_290_B_02.UAF) |
2022-10-14 |
2022-287 |
15:30:00 |
Crew Dragon Undocking (Crew-4 from N2Z) (M22_287_R_03.UAF) |
2022-10-06 |
2022-279 |
19:20:00 |
Crew Dragon Docking (Crew-5 to N2F) (M22_279_A_03.UAF) |
2022-09-26 |
2022-269 |
14:30:00 |
CTC3 Unstow Setup - ROBO possibly in FOV until 270-04:30 |
2022-09-22 |
2022-265 |
05:01:00 |
US OPM to pXVV with MMO3 (M22_265_A_03.UAF) |
2022-09-21 |
2022-264 |
05:32:00 |
RS OPM to nXVV (H22_264_B_04.UAF) |
2022-09-20 |
2022-263 |
15:14:11 |
Updated EOP and reset GEONS clock bias |
2022-09-12 |
2022-255 |
14:30:00 |
CTC3 Unstow Setup - ROBO possibly in FOV until 256-04:30 |
2022-09-08 |
2022-251 |
10:17:15 |
NICER FSW Action Point 126 tripped (IM reporting MPU4 no data received) causing RTS 65 to power off MPU4.\nNICER was not in SAA or either horn. Likely SEU on the PDB MPU 4 fully recovered at 22-251-12:15:54 |
2022-08-19 |
2022-231 |
14:30:00 |
Cargo Dragon Undocking (SpX-25 from N2F) (M22_231_A_03.UAF) |
2022-08-03 |
2022-215 |
00:18:45 |
Deployed NICER Post-MISSE ROBO Ops Day 3 |
2022-08-02 |
2022-214 |
12:18:32 |
Stowed NICER for MISSE ROBO Operations Day 3 |
2022-08-02 |
2022-214 |
04:22:16 |
Deployed NICER Post-MISSE ROBO Ops Day 2. |
2022-08-01 |
2022-213 |
12:20:20 |
Stowed NICER for MISSE ROBO Ops Day 2. |
2022-08-01 |
2022-213 |
05:08:08 |
Deployed NICER post MISSE ROBO Ops Day 1 |
2022-07-31 |
2022-212 |
12:20:28 |
Stowed NICER for MISSE ROBO Ops Day 1 |
2022-07-16 |
2022-197 |
13:25:00 |
Cargo Dragon Docking (SpX-25 to N2F) (M22_197_B_07.UAF) |
2022-07-11 |
2022-192 |
03:30:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_192_A_07.UAF) |
2022-07-07 |
2022-188 |
16:10:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_188_A_05.UAF) |
2022-06-26 |
2022-177 |
07:15:00 |
US OPM to pXVV with Timeliner Profile 11 (M22_177_A_03.UAF) |
2022-06-25 |
2022-176 |
03:23:00 |
US OPM to nXVV with Timeliner Profile 3 (M22_176_B_02.UAF) |
2022-06-21 |
2022-172 |
03:55:00 |
US OPM to pXVV with Timeliner Profile 11 (M22_172_B_05.UAF) |
2022-06-19 |
2022-170 |
15:43:00 |
US OPM to nXVV with Timeliner Profile 3 (M22_170_B_03.UAF) |
2022-06-16 |
2022-167 |
17:53:00 |
81P PDAM (M22_167_B_02.UAF) |
2022-06-10 |
2022-161 |
14:45:55 |
Detector 5-4 looked out of family so we reset it |
2022-05-27 |
2022-147 |
19:10:48 |
Updated EOP and reset GEONS clock bias |
2022-05-25 |
2022-145 |
17:30:00 |
CST-100 Undocking (OFT-2 on N2F) (M22_145_A_05.UAF) |
2022-05-20 |
2022-140 |
20:00:00 |
CST-100 Docking (OFT-2 to N2F) (M22_140_A_05.UAF) |
2022-05-19 |
2022-139 |
13:26:00 |
NICER Flash Image TMR checks and maintenance. |
2022-05-16 |
2022-136 |
23:05:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_136_A_03.UAF) |
2022-05-13 |
2022-133 |
01:00:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude (M22_133_A_08.UAF) |
2022-05-09 |
2022-129 |
04:10:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M22_129_A_03.UAF) |
2022-05-05 |
2022-125 |
04:37:00 |
Dragon Undocking (Crew-3 from N2F) (M22_125_D_02.UAF) |
2022-04-27 |
2022-117 |
22:25:00 |
Crew Dragon Docking (Crew-4 to N2Z) (M22_118_D_03.UAF) |
2022-04-26 |
2022-116 |
05:05:00 |
ROBO Parked Post Translate in NICER FOV until 22-126-13:20 |
2022-04-25 |
2022-115 |
00:20:00 |
Dragon Undocking (Axiom-1 from N2Z) (M22_115_B_03.UAF) |
2022-04-19 |
2022-109 |
15:56:00 |
Updated EOP and reset GEONS clock bias |
2022-04-09 |
2022-099 |
11:30:00 |
Added commanding to load to look starboard from 99-11:30 to 99-11:55 due to Axiom-1 docking at N2Z. |
2022-04-09 |
2022-099 |
09:55:00 |
Dragon Docking (Axiom-1 to N2Z) (M22_099_B_03.UAF) |
2022-04-05 |
2022-095 |
17:32:00 |
Science downtime between 22-095-17:32 and22-095-17:40 (8 minutes) due timing of the ATS switchover |
2022-03-31 |
2022-090 |
23:40:00 |
ROBO Parked MT Translate Config until 22-103-15:20. Parked in NICER FOV. |
2022-03-26 |
2022-085 |
19:00:00 |
Ops: MT Translate 6 to 2 - ROBO in FOV until 095-17:45 |
2022-03-26 |
2022-085 |
18:05:00 |
MT Translate WS6 2 |
2022-03-19 |
2022-078 |
06:39:00 |
RS OPM to pXVV |
2022-03-18 |
2022-077 |
05:51:00 |
RS OPM to -XVV |
2022-03-11 |
2022-070 |
23:17:58 |
Updated EOP and reset GEONS clock bias |
2022-02-07 |
2022-038 |
14:30:00 |
Ops: Walkoff to MBS3, Mnvr to translate config - ROBO in FOV until 038-18:30 |
2022-02-05 |
2022-036 |
21:58:00 |
MPU7 SEU caused all MPU7 detectors to be offline. Recovered at 036-23:23. |
2022-02-03 |
2022-034 |
15:00:00 |
Ops: MT Translate WS 7 to WS 2 - ROBO in FOV until 034-22:00 |
2022-01-31 |
2022-031 |
13:26:14 |
Updated EOP and reset GEONS clock bias |
2022-01-23 |
2022-023 |
15:05:00 |
Dragon Undocking (SpX-24 from N2Z) (M22_023_A_03.UAF) |
2022-01-20 |
2022-020 |
16:30:47 |
Pointed NICER starboard during SpX-24 Thruster Hot Fire Testing. Science plan was stopped at 22-020-16:30:47z and resumed at 22-020-17:36:48 |
2022-01-14 |
2022-014 |
15:40:00 |
Ops: SPDM Stow, Triple Walkoff, MT translate 3 to 4. Impacts NICER FOV until 22-015-04:00 |
2022-01-11 |
2022-011 |
19:40:00 |
ROBO Parked for SPX24 Day 3 in our FOV. Impacts until 22-014-15:40 |
2022-01-11 |
2022-011 |
12:10:00 |
Ops: SPX24 Day 3 STP-H7 Install. Impacts NICER FOV until 22-011-19:40 |
2022-01-10 |
2022-010 |
16:10:00 |
ROBO Parked for SPX24 Day 2 in our FOV. Impacts until 22-011-12:10 |
2022-01-10 |
2022-010 |
10:25:00 |
Ops: SPX24 Day 2 ASIM Transfer. Impacts NICER FOV until 22-010-16:10 |
2022-01-08 |
2022-008 |
08:00:00 |
Ops: ASIM Relocate Setup. Impacts NICER FOV until 09:00 |
2022-01-08 |
2022-008 |
09:00:00 |
ROBO Parked for ASIM Relocate in our FOV. Impacts until 22-010-10:25 |
2021-12-29 |
2021-363 |
03:49:17 |
Performed FSW Target Manager App update to version 2.0.0 at 21-363-03:49:17z to support future OHMAN ToOs. |
2021-12-28 |
2021-362 |
13:05:00 |
Stowed NICER because of MISSE Ops Day 3. Configured for background measurements. Science resumed at 21-363-04:04:23 |
2021-12-27 |
2021-361 |
12:42:22 |
Stowed NICER because of MISSE Ops Day 2. Configured for background measurements. Science resumed at 21-362-06:26:33 |
2021-12-26 |
2021-360 |
12:45:13 |
Stowed NICER because of MISSE Ops Day 1. Configured for background measurements. Science resumed at 21-361-07:16:50. |
2021-12-24 |
2021-358 |
07:52:00 |
RS OPM to pXVV |
2021-12-22 |
2021-356 |
06:54:00 |
Cargo Dragon Docking (SpX-24 to N2Z) |
2021-12-20 |
2021-354 |
14:03:50 |
Updated EOP and reset GEONS clock bias |
2021-12-11 |
2021-345 |
20:40:00 |
Yaw Bias Maneuver |
2021-12-09 |
2021-343 |
00:57:00 |
RS OPM to pXVV |
2021-12-08 |
2021-342 |
01:24:00 |
RS OPM to nXVV |
2021-12-03 |
2021-337 |
15:48:00 |
OPM to pXVV with Timeliner Profile 13 |
2021-12-03 |
2021-337 |
06:48:00 |
79P 180 Degree PDAM |
2021-12-01 |
2021-335 |
15:58:26 |
Reset the star tracker to clear stuck imaging that started at 21-334-22:38:46 |
2021-11-27 |
2021-331 |
03:02:00 |
RS OPM to pXVV |
2021-11-26 |
2021-330 |
00:56:00 |
US OPM to nXVV with Timeliner Profile 6 |
2021-11-11 |
2021-315 |
22:00:00 |
Crew-3 Dragon Docking to N2F |
2021-11-10 |
2021-314 |
19:05:00 |
PDAM Aft Progress MLM Roll |
2021-11-09 |
2021-313 |
14:02:17 |
Updated EOP and reset GEONS clock bias |
2021-11-08 |
2021-312 |
18:40:00 |
Dragon Undocking - physical sep at 19:05:00 |
2021-11-04 |
2021-308 |
16:35:00 |
Desat Enable |
2021-11-03 |
2021-307 |
16:35:55 |
Stopped NICER science plan and pointed starboard for Crew-2 thruster fire test. Science plan resumed at 17:02:27 |
2021-11-03 |
2021-307 |
15:00:00 |
Crew-2 Thruster Test on US Control - thruster fire at 16:40 |
2021-10-15 |
2021-288 |
09:13:00 |
LoAC Response - High ISS attitude error leading to Loss of CMG Attitude Control and Loss of ISS Attitude Control\nAt 0913 we were in a declared LOAC that reached a max attitude of 58deg negative pitch @ 0924.\nADCO reported stationed returned to its correct attitude @ 0955.\nPOIC resumed normal operations @ 1007 with command enablement’s back in place by 1009.\nPossible SA obstructions until about 22:00 |
2021-10-15 |
2021-288 |
08:45:00 |
SW Thruster Disable for 64S Thruster Test Part 2 - NICER viewed the CRAB during this time. Attitude may be off nominal due to anomaly described in next row. |
2021-10-04 |
2021-277 |
14:12:00 |
Updated EOP and reset GEONS clock bias |
2021-09-30 |
2021-273 |
17:20:00 |
RMCT2 Stow, Manvr to RELL Setup - ROBO arm may be in and out of NICER FOV until 273-22:20 |
2021-09-30 |
2021-273 |
12:24:00 |
Dragon Undocking (SpX-23 from N2F) |
2021-09-29 |
2021-272 |
04:39:00 |
NICER team suspects ISS structure blockage for a minute around this time. |
2021-09-29 |
2021-272 |
02:26:00 |
OPM to pXXV with Timeliner Profile 13 |
2021-09-28 |
2021-271 |
11:20:00 |
64S Relocate with USTO Maneuvers - HOSC turned off power to NICER preheaters during this activity |
2021-09-24 |
2021-267 |
06:13:00 |
OPM to nXVV with Timeliner Profile 6 |
2021-09-23 |
2021-266 |
04:49:28 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-09-22 |
2021-265 |
18:47:03 |
NICER STOW for ROBO/MISSE Ops -background data collection |
2021-09-22 |
2021-265 |
05:23:15 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-09-21 |
2021-264 |
18:43:00 |
NICER STOW for ROBO/MISSE Ops -background data collection |
2021-09-17 |
2021-260 |
19:30:00 |
Thruster Disable MT Translate WS7 to WS2 - ROBO arm may be in and out of NICER FOV until 261-00:00 |
2021-09-16 |
2021-259 |
23:12:00 |
NICER star tracker imaging stuck until ST reset commanded at 21-260-12:04:57 |
2021-09-13 |
2021-256 |
17:49:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-17:49 to 18:09 |
2021-09-13 |
2021-256 |
14:47:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-256-14:47 to 15:04 |
2021-09-11 |
2021-254 |
17:50:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-17:50 to 18:11 |
2021-09-11 |
2021-254 |
16:36:07 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-254-16:36 to 16:47 |
2021-09-09 |
2021-252 |
16:18:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-252-16:18 to 16:46 |
2021-08-30 |
2021-242 |
12:55:00 |
Dragon Docking (SpX-23 to N2F) |
2021-08-27 |
2021-239 |
04:32:00 |
NICER star tracker imaging stuck until ST reset commanded at 12:02:07 |
2021-08-23 |
2021-235 |
22:33:46 |
Updated EOP and Reset GEONS Clock Bias |
2021-08-11 |
2021-223 |
16:22:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-16:22:14 to 21-223-21:32. After this 16:22 attempt, NICER was misconfigured (GCE motors at their soft stops), so targetting was not happening until 21:32 when it was corrected. |
2021-08-11 |
2021-223 |
11:42:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-223-11:43:06 to 11:59:41 |
2021-08-10 |
2021-222 |
21:47:27 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-21:47:27 to 22:05:43 |
2021-08-10 |
2021-222 |
12:27:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-222-12:28:03 to 12:54:16 |
2021-08-09 |
2021-221 |
13:36:00 |
Crab Earth Horizon Crossing Observation - normal science plan stopped from 21-221-13:13:10 to 13:38:03. |
2021-08-08 |
2021-220 |
09:46:06 |
MPU 5 powered off after AP#127(No data received) tripped during passage through SAA. MPU 5 recovery complete at 220-10:40:39 |
2021-07-30 |
2021-211 |
03:00:00 |
OPM to pXVV with Timeliner Profile 13 |
2021-07-29 |
2021-210 |
17:28:00 |
ISS back to planned attitude |
2021-07-29 |
2021-210 |
16:49:01 |
"-XVV +ZLV TEA" |
2021-07-29 |
2021-210 |
16:34:00 |
LoAC Contingency Response - High ISS attitude rates due to anomlous MLM thurster firings |
2021-07-22 |
2021-203 |
07:30:00 |
OPM to nXVV with Timeliner Profile 1 |
2021-07-22 |
2021-203 |
15:27:51 |
Updated EOP and Reset GEONS Clock Bias |
2021-07-22 |
2021-203 |
15:21:11 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to nominal detector config. |
2021-07-21 |
2021-202 |
10:10:00 |
Crew-2 Port Relocate N2F to N2Z |
2021-07-19 |
2021-200 |
21:34:44 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,1-5,1-6,1-7,2-1,2-3,2-4,2-5,2-6,2-7,2-8,3-2,3-4,3-5,3-6,3-7,3-8,4-1,4-2,4-3,4-5,4-6,4-7,4-8,5-1,5-2,5-3,5-4,5-5,5-6,5-7,6-1,6-2,6-3,6-4,6-5,6-6,6-7,7-2,7-3,7-4,7-5,7-6,7-7,7-8. |
2021-07-18 |
2021-199 |
16:41:00 |
OPM to pXVV with Timeliner Profile 7 |
2021-07-18 |
2021-199 |
22:00:00 |
CMG Mnvr pXVV Yaw Bias |
2021-07-11 |
2021-192 |
03:01:00 |
OPM to nXVV with Timeliner Profile 2 |
2021-07-11 |
2021-192 |
09:00:00 |
CMG Mnvr nXVV Yaw Bias |
2021-07-09 |
2021-190 |
15:18:00 |
CMG Mnvr pXVV Yaw Bias |
2021-07-08 |
2021-189 |
14:30:00 |
NICER commanded to joint target mode to look away from planned Dragin departure. NICER back on science targeting at 14:56:00 |
2021-07-08 |
2021-189 |
14:00:00 |
Dragon Undocking (SpX-22 from PMA-3) |
2021-07-06 |
2021-187 |
14:57:00 |
NICER commanded to joint target mode to look away from planned Dragin departure. Departure delayed until DOY 189. NICER back on science targeting at 15:13:39 |
2021-07-06 |
2021-187 |
14:09:30 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,1-4,2-1,2-3,2-5,2-6,3-2,3-5,3-6,3-7,4-1,4-2,4-3,4-6,5-1,5-2,5-3,5-7,6-1,6-2,6-3,6-4,7-2,7-3,7-6,7-7. |
2021-07-02 |
2021-183 |
11:18:00 |
OPM to pXVV with Timeliner Profile 7 |
2021-07-01 |
2021-182 |
15:10:00 |
OPM to nXVV with Timeliner Profile 1 |
2021-06-25 |
2021-176 |
06:42:18 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6. |
2021-06-25 |
2021-176 |
04:01:58 |
NICER Safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-176-05:55:32 |
2021-06-24 |
2021-174 |
23:16:30 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to enabling all nominal detectors |
2021-06-22 |
2021-173 |
17:15:27 |
Updated EOP and Reset GEONS Clock Bias. |
2021-06-22 |
2021-173 |
14:51:24 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,1-3,2-1,2-3,2-5,3-2,3-5,3-6,4-1,4-2,4-3,5-1,5-2,5-3,6-1,6-2,6-3,7-2,7-3,7-6. |
2021-06-16 |
2021-167 |
14:05:23 |
Science plan modified detector config for TARGETID=5220 and TARGETID=6574 to 1-1,1-2,2-1,2-3,3-2,3-4,4-1,4-2,5-1,5-2,6-1,6-2,7-2,7-3. |
2021-06-14 |
2021-165 |
15:08:58 |
Science plan modified detector config for TARGETID=5220 to that in use with RTS08 |
2021-06-14 |
2021-165 |
20:57:20 |
Science plan modified detector config for TARGETID=5220 to 1-3,2-4,3-5,4-2,5-2,6-3,7-3 enabled |
2021-06-12 |
2021-163 |
04:15:00 |
Science plan modified detector config for TARGETID=5220 to that in use with RTS08 |
2021-06-12 |
2021-163 |
22:55:32 |
Science plan modified detector config for TARGETID=5220 to 1-1,1-2,1-3,2-1,2-3,2-4,3-2,3-4,3-5,4-1,4-2,4-3,5-1,5-2,5-3,5-8,6-1,6-2,6-3,6-8,7-2,7-3,7-4,7-8 enabled |
2021-06-11 |
2021-162 |
22:10:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-162-22:10- 21-163-02:10 |
2021-06-07 |
2021-158 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-158-14:30 - 21-153-21:30 |
2021-06-05 |
2021-156 |
07:24:00 |
Dragon Docking (SpX-22 to PMA-3) |
2021-05-27 |
2021-147 |
13:50:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-147-18:25 - 21-147-23:35 |
2021-05-24 |
2021-144 |
18:45:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-144-18:45 - 21-144-22:00 |
2021-05-23 |
2021-143 |
00:00:00 |
Possible NICER FOV Obstruction due to ROBO activity, times unknown. |
2021-05-19 |
2021-139 |
13:30:00 |
Updated EOP and Reset GEONS Clock Bias. |
2021-05-18 |
2021-138 |
00:20:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_138_A_03.UAF) |
2021-05-17 |
2021-137 |
14:10:00 |
NICER detector TECs commanded to max temp setpoints. Ops team had forgotten to do this after MISSE operations in April. TECs cooled to nominal setpoints from April 25th to today. |
2021-05-17 |
2021-137 |
00:21:00 |
NICER safe mode due to inadequate number of GPS signals for more than 10 minutes. Science resumed at 21-137-13:51:15 |
2021-05-13 |
2021-133 |
21:30:00 |
CMG Maneuver to High-Beta Yaw Bias Attitude |
2021-05-10 |
2021-130 |
23:50:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2021-05-07 |
2021-127 |
13:15:00 |
Reset star tracker after imaging got stuck a while ago |
2021-05-03 |
2021-123 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-123-14:30 - 21-123-21:30 |
2021-05-02 |
2021-122 |
00:00:00 |
Dragon Undocking (Crew-1 from PMA-3) - physical sep at 00:35 |
2021-04-29 |
2021-119 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-119-14:30 - 21-119-20:30 |
2021-04-28 |
2021-118 |
13:23:00 |
Reset star tracker after imaging got stuck a while ago |
2021-04-25 |
2021-115 |
09:03:38 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-24 |
2021-114 |
21:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-114-21:30 - 21-115-00:30 |
2021-04-24 |
2021-114 |
13:05:34 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-24 |
2021-114 |
07:35:00 |
Dragon Docking (Crew-2 to PMA-2) |
2021-04-24 |
2021-114 |
01:04:22 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-23 |
2021-113 |
21:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-113-21:30 - 21-114-14:30 |
2021-04-23 |
2021-113 |
13:14:11 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-23 |
2021-113 |
01:03:06 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-22 |
2021-112 |
13:04:05 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-22 |
2021-112 |
09:10:00 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-21 |
2021-111 |
13:21:58 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-20 |
2021-110 |
05:15:22 |
NICER STOW for ROBO/MISSE MSC XFER - detectors being annealed |
2021-04-20 |
2021-110 |
03:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-110-03:00 - 21-110-05:00 |
2021-04-20 |
2021-110 |
10:59:28 |
NICER re-deploy post-ROBO/MISSE Operations - science resumed |
2021-04-09 |
2021-099 |
13:53:00 |
Updated EOP and reset GEONS Clock Bias |
2021-04-05 |
2021-095 |
09:55:00 |
Crew-1 Port Relocate N2F to N2Z |
2021-03-23 |
2021-082 |
18:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-082-18:00 - 21-083-00:00 |
2021-03-20 |
2021-079 |
03:46:00 |
RS OPM to pXVV |
2021-03-19 |
2021-078 |
02:52:00 |
RS OPM to nXVV |
2021-03-05 |
2021-064 |
18:18:00 |
HOSC removed power to J3AB which is NICER's survival heater power circuit to support EVA for ISS power upgrades |
2021-03-02 |
2021-061 |
18:18:00 |
Updated EOP and reset GEONS Clock Bias |
2021-02-19 |
2021-050 |
15:06:00 |
Commanded TOO of the Crab for alignment checks |
2021-02-16 |
2021-047 |
16:58:00 |
Commanded all MPU TEC temperature setpoints to max setpoint |
2021-02-12 |
2021-043 |
11:45:00 |
Commanded MPU1 all detectors to nominal TEC temp setpoint |
2021-02-12 |
2021-043 |
09:06:00 |
Commanded MPU4 and MPU1 all detectors to max TEC temp setpoint |
2021-02-12 |
2021-043 |
14:15:00 |
Commanded MPU4 detectors temp setpoints to nominal values |
2021-02-09 |
2021-040 |
07:30:00 |
HOSC ISS APS anomaly resulting in corrupt NICER data being sent to the SPOCC. Data outage lasts until the end of the DOY. Also, DOY 041 data was very ratty due to same anomaly. Data unrecoverable. |
2021-02-09 |
2021-040 |
04:20:00 |
76P departure maneauver to +ZVV 21-040-04:20:01 - 21-040-04:40:00, Undocking 21-040-05:18 - 21-040-05:22:10, maneuaver to +XVV 21-040-05:28:01 - 21-040-05:58:00 |
2021-02-09 |
2021-040 |
09:30:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude (M21_040_B_03.UAF) |
2021-02-02 |
2021-033 |
14:20:00 |
MPU 4-5 detector annealing completed |
2021-02-01 |
2021-032 |
16:08:00 |
Updated EOP and reset GEONS Clock Bias |
2021-01-31 |
2021-031 |
08:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-031-08:30 - 21-031-18:30 |
2021-01-29 |
2021-029 |
16:25:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-029-16:25 - 21-030-02:40 |
2021-01-28 |
2021-028 |
14:40:00 |
Possible NICER FOV Obstruction due to ROBO activity 21-028-14:30 - 21-029-02:30 |
2021-01-26 |
2021-026 |
14:22:00 |
MPU 4-5 detector annealing started |
2021-01-12 |
2021-012 |
13:40:00 |
Dragon Undocking (SpX-21 to PMA-3) (M21_012_B_02.UAF) |
2021-01-11 |
2021-011 |
13:55:00 |
Aborted SpaceX-21 Undocking (M21_011_B_02.UAF) |
2021-01-10 |
2021-010 |
14:15:00 |
Dragon Thruster Test on RS control (SpX-21 to PMA-3) (M21_010_A_03.UAF) |
2021-01-08 |
2021-008 |
14:40:00 |
Possible NICER FOV Obstruction due to SpaceX-21 undock setup 21-008-14:30 - 21-008-23:05 |
2021-01-05 |
2021-005 |
18:54:00 |
Observed the crab for calibration purposes. Modified PC parameters table to adjust the star tracker to instrument boresight alignment matrix |
2020-12-28 |
2020-363 |
02:46:55 |
NICER MPU 4 anomalous power off while in SAA |
2020-12-23 |
2020-358 |
18:00:00 |
NICER activated and redeployed. Science resumed at 22:30:19 |
2020-12-19 |
2020-354 |
04:15:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2020-12-18 |
2020-352 |
00:36:47 |
NICER activation after ISS circuit 4B recovery, but immediately powered off when SPARTAN reported issues still with circuit 4B. |
2020-12-13 |
2020-348 |
17:25:00 |
NICER activated, stowed and deactivated via ISS power circuit 4A until circuit 4B anomaly can be figured out |
2020-12-12 |
2020-347 |
09:40:00 |
ISS 4B power circuit failure on the ISS which powered off NICER - Survival heater circuit still powered |
2020-12-11 |
2020-346 |
05:10:00 |
CMG Maneuver to High Beta Yaw Bias Attitude |
2020-12-10 |
2020-345 |
02:35:00 |
CMG Maneuver to Mid-Beta Yaw Bias Attitude |
2020-12-07 |
2020-342 |
19:53:00 |
MPU 2-7 detector annealing started |
2020-12-07 |
2020-342 |
19:49:00 |
MPU 4-5 detector annealing completed |
2020-12-07 |
2020-342 |
17:43:00 |
Stopped science plan and pointed NICER starboard to avoid any contamination that could come from the docking Dragon thruster plumes. Science plan resumed at 18:45:12 |
2020-12-07 |
2020-342 |
16:55:00 |
Dragon Docking (SpX-21 to PMA-3) |
2020-12-03 |
2020-338 |
17:01:00 |
Updated GPS GEONS EOP and reset |
2020-11-28 |
2020-333 |
02:54:45 |
NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed |
2020-11-27 |
2020-332 |
14:06:48 |
NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed |
2020-11-26 |
2020-331 |
07:12:01 |
NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed |
2020-11-25 |
2020-330 |
00:10:13 |
NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed |
2020-11-23 |
2020-328 |
16:42:00 |
MPU 4-5 detector annealing started |
2020-11-23 |
2020-328 |
16:39:00 |
MPU 2-8 detector annealing completed |
2020-11-21 |
2020-326 |
07:49:34 |
NICER processor reset based on exception in task tXbdServiceat. SEU in SAA. Science resumed at 326-10:28:06 |
2020-11-16 |
2020-321 |
14:17:00 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-11-16 |
2020-321 |
02:25:00 |
Dragon Docking (Crew-1 to PMA-2) |
2020-11-16 |
2020-321 |
14:24:00 |
MPU 1-1 detector annealing completed |
2020-11-16 |
2020-321 |
14:24:00 |
MPU 2-8 detector annealing started |
2020-11-10 |
2020-315 |
16:12:00 |
Updated GPS GEONS EOP and reset |
2020-11-09 |
2020-314 |
16:28:00 |
MPU 1-1 detector annealing started |
2020-11-09 |
2020-314 |
16:24:00 |
MPU 1-2 detector annealing completed |
2020-11-07 |
2020-312 |
03:52:02 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-11-02 |
2020-307 |
13:49:00 |
MPU 1-2 detector annealing started |
2020-11-02 |
2020-307 |
13:47:00 |
MPU 1-3 detector annealing completed |
2020-10-30 |
2020-304 |
12:49:00 |
NICER Safe Mode due to GCE Overcurrent trip, near SAA |
2020-10-26 |
2020-300 |
14:29:00 |
MPU 1-3 detector annealing started |
2020-10-26 |
2020-300 |
14:27:00 |
MPU 1-4 detector annealing completed |
2020-10-19 |
2020-293 |
16:55:00 |
MPU 1-4 detector annealing started |
2020-10-19 |
2020-293 |
16:47:00 |
MPU 1-5 detector annealing completed |
2020-10-15 |
2020-289 |
02:35:00 |
NICER Safe Mode due to GCE Overcurrent trip, near SAA |
2020-10-12 |
2020-286 |
15:45:00 |
MPU 1-6 detector annealing completed |
2020-10-12 |
2020-286 |
15:46:00 |
MPU 1-5 detector annealing started |
2020-10-07 |
2020-281 |
11:02:00 |
OPM to pXVV with Timeliner Profile 7 |
2020-10-06 |
2020-280 |
21:05:00 |
OPM to nXVV with Timeliner Profile 2 |
2020-10-05 |
2020-279 |
16:12:00 |
MPU 1-6 detector annealing started |
2020-10-05 |
2020-279 |
16:08:00 |
MPU 1-7 detector annealing completed |
2020-10-02 |
2020-275 |
14:31:00 |
Updated GPS GEONS EOP and reset |
2020-09-28 |
2020-272 |
13:58:00 |
MPU 1-7 detector annealing started |
2020-09-28 |
2020-272 |
13:49:00 |
MPU 1-8 detector annealing completed |
2020-09-22 |
2020-266 |
21:19:00 |
PDAM Aft Progress Prog Roll |
2020-09-21 |
2020-265 |
16:12:00 |
MPU 1-8 detector annealing started |
2020-09-21 |
2020-265 |
16:03:00 |
MPU 5-5 detector annealing completed |
2020-09-18 |
2020-262 |
13:15:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-262-13:15 - 20-262-20:40 |
2020-09-14 |
2020-258 |
16:28:00 |
MPU 5-6 detector annealing completed |
2020-09-14 |
2020-258 |
16:38:00 |
MPU 5-5 detector annealing started |
2020-09-11 |
2020-255 |
14:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-255-14:00 - 20-255-23:50 |
2020-09-04 |
2020-248 |
20:26:00 |
MPU 5-6 detector annealing started |
2020-09-03 |
2020-247 |
21:36:00 |
NICER Deploy post-SPDM MISSE Ops Day 3 - Science Resumed |
2020-09-03 |
2020-247 |
21:49:00 |
NICER Star Tracker reset from ground after imaging got stuck |
2020-09-02 |
2020-246 |
23:53:00 |
NICER Deploy post-SPDM MISSE Ops Day 2 - Science Resumed |
2020-09-02 |
2020-247 |
12:17:00 |
NICER Stow for SPDM MISSE Ops Day 3 - Detectors being annealed |
2020-09-02 |
2020-246 |
12:29:00 |
NICER Stow for SPDM MISSE Ops Day 2 - Detectors being annealed |
2020-09-01 |
2020-245 |
22:43:00 |
NICER Deploy post-SPDM MISSE Ops Day 1 - Science Resumed |
2020-09-01 |
2020-245 |
22:28:00 |
Updated GPS GEONS EOP and reset |
2020-09-01 |
2020-245 |
12:23:00 |
NICER Stow for SPDM MISSE Ops Day 1 - Detectors being annealed |
2020-08-28 |
2020-241 |
15:31:00 |
MPU 5-7 detector annealing started |
2020-08-28 |
2020-241 |
15:15:00 |
MPU 5-8 detector annealing completed |
2020-08-21 |
2020-234 |
14:40:00 |
MPU 5-8 detector annealing started |
2020-08-21 |
2020-234 |
14:30:00 |
MPU 5-1 detector annealing completed |
2020-08-14 |
2020-227 |
15:02:00 |
MPU 5-1 detector annealing started |
2020-08-14 |
2020-227 |
14:57:00 |
MPU 5-4 detector annealing completed |
2020-08-07 |
2020-220 |
13:25:00 |
MPU 5-4 detector annealing started |
2020-08-07 |
2020-220 |
12:34:00 |
MPU 5-2 detector annealing completed |
2020-08-06 |
2020-219 |
13:21:00 |
Modified RTS 241 to include disabling detectors 4-5 and 5-4 at low sun angles |
2020-08-04 |
2020-217 |
14:23:00 |
Modified RTS 243 to disable detector 5-4 at low sun angles |
2020-08-01 |
2020-214 |
23:00:00 |
Dragon Undocking |
2020-07-31 |
2020-213 |
19:14:00 |
MPU 5-3 detector annealing complete |
2020-07-31 |
2020-213 |
20:19:00 |
MPU 5-2 detector annealing started |
2020-07-27 |
2020-209 |
16:30:00 |
MPU 5-3 detector annealing started |
2020-07-27 |
2020-209 |
12:57:00 |
MPU 5-4 detector annealing completed |
2020-07-24 |
2020-206 |
05:36:00 |
OPM to +XVV with Timeliner Profile 9 |
2020-07-23 |
2020-205 |
20:29:00 |
MPU 5-4 detector annealing started |
2020-07-23 |
2020-205 |
17:22:00 |
MPU 5-4 detector annealing completed |
2020-07-23 |
2020-205 |
06:22:00 |
OPM to -XVV with Timeliner Profile 5 |
2020-07-22 |
2020-204 |
17:21:00 |
MPU 5-4 detector annealing started |
2020-07-22 |
2020-204 |
14:10:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-204-14:10 - 20-204-17:10 |
2020-07-20 |
2020-202 |
14:37:00 |
MPU 5-4 detector was misbehaving at low SUn anlges. Turned it off a few times. Updated RTS 243 to disable MPU 5-4 at low sun angles |
2020-07-13 |
2020-195 |
04:10:00 |
CMG Manuever to high-Beta Yaw Bias Attitude |
2020-07-12 |
2020-194 |
02:01:00 |
OPM to +XVV with Timeliner Profile 10 |
2020-07-12 |
2020-194 |
04:21:00 |
CMG Manuever to mid-Beta Yaw Bias Attitude |
2020-07-11 |
2020-193 |
08:58:00 |
OPM to -XVV with Timeliner Profile 5 |
2020-07-10 |
2020-192 |
14:30:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-192-14:30 - 20-192-18:00 |
2020-07-10 |
2020-192 |
19:00:00 |
CMG Manuever to mid-Beta Yaw Bias Attitude |
2020-07-06 |
2020-188 |
14:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-188-14:00 - 20-188-17:00 |
2020-07-03 |
2020-185 |
14:35:00 |
PDAM - 75P Aft Progress- Prog Roll |
2020-06-24 |
2020-176 |
15:00:00 |
Possible NICER FOV Obstruction due to ROBO activity 20-176-15:00 - 20-176-19:30 |
2020-06-08 |
2020-160 |
18:52:00 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-05-31 |
2020-152 |
14:29:56 |
Dragon Docking to PMA2 |
2020-05-18 |
2020-139 |
20:55:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-14 |
2020-135 |
19:14:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-11 |
2020-132 |
21:20:00 |
CMG Maneuver to Yaw Bias Attitude |
2020-05-06 |
2020-127 |
21:03:32 |
NICER Safe mode due to invalid GPS signals (Science downtime from 20-127-21:03:32 - 21:27:37. |
2020-05-05 |
2020-126 |
22:03:00 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-04-25 |
2020-116 |
16:10:00 |
OPM to +XVV with Timeliner Profile 7 |
2020-04-24 |
2020-115 |
20:00:39 |
OPM to -XVV with Timeliner Profile 2 |
2020-04-19 |
2020-110 |
08:18:00 |
OPM to +XVV with Timeliner Profile 7 |
2020-04-19 |
2020-110 |
04:55:00 |
NICER Safe mode due to invalid GPS signals (Science downtime from 20-110-04:55 - 05:24. |
2020-04-18 |
2020-109 |
18:20:00 |
OPM to -XVV with Timeliner Profile 2 |
2020-04-10 |
2020-101 |
01:00:00 |
US OPM to +XVV with Profile 7 |
2020-04-09 |
2020-100 |
03:18:00 |
US OPM to -XVV with Profile 1 |
2020-04-07 |
2020-098 |
11:23:00 |
SpaceX-20 Release (Release at 13:05:00) |
2020-04-07 |
2020-098 |
09:35:00 |
SpaceX-20 Unberth |
2020-03-25 |
2020-085 |
12:45:28 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-03-20 |
2020-080 |
06:42:36 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #4 |
2020-03-20 |
2020-080 |
06:02:12 |
Background Data Collection ended for re-deploy |
2020-03-19 |
2020-079 |
19:34:36 |
Background Data Collection started |
2020-03-19 |
2020-079 |
19:02:25 |
NICER stowed for Day #4 of MISSE ROBO Ops |
2020-03-19 |
2020-079 |
06:14:37 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #3 |
2020-03-19 |
2020-079 |
05:36:28 |
Background Data Collection ended for re-deploy |
2020-03-18 |
2020-078 |
13:07:35 |
Stowed NICER for MISSE ROBO Ops Day #3 |
2020-03-18 |
2020-078 |
05:54:50 |
Background Data Collection ended for re-deploy |
2020-03-18 |
2020-078 |
13:36:23 |
Background Data Collection started |
2020-03-18 |
2020-078 |
06:36:13 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #2 |
2020-03-17 |
2020-077 |
06:51:47 |
NICER re-deployed and back in Science Operations after MISSE ROBO Ops Day #1 |
2020-03-17 |
2020-077 |
06:12:04 |
Background Data Collection ended for re-deploy |
2020-03-17 |
2020-077 |
12:37:40 |
NICER stowed for Day #2 of MISSE ROBO Ops |
2020-03-17 |
2020-077 |
13:20:57 |
Background Data Collection started |
2020-03-16 |
2020-076 |
13:13:03 |
Background Data Collection started |
2020-03-16 |
2020-076 |
12:35:01 |
Stowed NICER for MISSE ROBO Ops |
2020-03-09 |
2020-069 |
11:00:00 |
SpaceX-20 Capture and Install |
2020-03-06 |
2020-066 |
06:50:57 |
NICER safe mode due to invalid GPS signals. Science was resumed at 2020-066-07:28:40. |
2020-03-04 |
2020-064 |
06:46:16 |
NICER safe mode due to invalid GPS signals. Science was resumed at 2020-064-12:56:54. |
2020-02-18 |
2020-049 |
17:00:00 |
Noticed on ISS camera feed that there is some peeling of the silver teflon on the Star tracker baffle. Looking through archival off ISS photos it looks like this began sometime between Feb and May 2019. |
2020-02-13 |
2020-044 |
14:31:55 |
Reset GEONS and GEONS clock Bias and updated Earth Orientation Parameters |
2020-02-03 |
2020-034 |
16:25:00 |
NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings. 16:25:25 - 16:57:35 and 17:59:17 - 18:16:11 and 19:30:21 - 19:50:25 and 21:06:01 - 21:23:20 |
2020-01-31 |
2020-031 |
18:48:06 |
NICER manual drive to observations of V4641_Sgr that involved low Earth horizon crossings. 18:48:06 - 19:05:13 and 20:19:16 - 20:34:49. |
2020-01-26 |
2020-026 |
05:18:51 |
MPU 4 powered off due to Limit Check Action Point 126 trip (IM reported data from MPU4 not received for 8 seconds) |
2020-01-25 |
2020-025 |
19:23:19 |
NICER Re-deploy after AMS EVA #4. Background collection stopped at 18:48:45 |
2020-01-25 |
2020-025 |
10:05:32 |
NICER Stow for AMS EVA #4 - background data collection begins at 10:44:18 |
2020-01-15 |
2020-015 |
16:38:00 |
Pointed NICER in the direction of the astronaut EVA until 16:55. |
2020-01-14 |
2020-014 |
14:45:00 |
NICER in Safemode after manual reset of the star tracker. The ST attitude was invalid due to an incorrect AGS7 load earlier at 14:31 which didn't account for ISS structure obstruction so some observations (namely PSR_J0437-4715_opt1) were obstructed until the load was replaced at 21:40. NICER left safe mode at 15:30. |
2020-01-13 |
2020-013 |
19:38:14 |
Attempted to track NGC_4151 rising through Earth's limb. Science plan resumed at 19:51:56. |
2020-01-10 |
2020-010 |
18:39:00 |
Interrupted science timeline to view NGC 4151 as it rose behind the Earth. Also, attempted to track Crab Pulsar as it set, but it was slightly out of Azimuth range. Science plan resumed at 19:25:01. |
2020-01-07 |
2020-007 |
06:36:00 |
SpaceX-19 Release |
2020-01-07 |
2020-007 |
04:35:00 |
SpaceX-19 Unberth |
2020-01-06 |
2020-006 |
20:14:00 |
Reset the star tracker to clear up issue with storing images |
2020-01-03 |
2020-003 |
18:13:24 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-12-31 |
2019-365 |
10:28:00 |
RS OPM DTO to +XVV |
2019-12-30 |
2019-364 |
08:25:00 |
RS OPM DTO to -XVV |
2019-12-23 |
2019-357 |
17:24:55 |
Interrupted science timeline to view Herc_X1 as it rose behind the Earth, but ISS arrays were obstructing the view. Science plan resumed at 17:39:35 |
2019-12-17 |
2019-351 |
23:35:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-17 |
2019-351 |
05:15:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-13 |
2019-347 |
08:16:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-12-08 |
2019-342 |
10:30:00 |
SpaceX-19 Capture |
2019-12-02 |
2019-336 |
10:10:56 |
Stowed NICER for AMS EVA #3. Background data collection begins. |
2019-12-02 |
2019-336 |
19:01:27 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #3. Background data collection halted. |
2019-11-26 |
2019-330 |
14:11:59 |
Earth Limb Crab Observations attempted throughout the day |
2019-11-22 |
2019-326 |
18:38:31 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #2. Background data collection halted. |
2019-11-22 |
2019-326 |
10:26:45 |
Stowed NICER for AMS EVA #2. Background data collection begins. |
2019-11-20 |
2019-324 |
18:38:22 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-11-18 |
2019-322 |
16:48:01 |
Switched to GEONS for GPS. It had been using SPS since after the EVA. |
2019-11-15 |
2019-319 |
19:24:21 |
Redeploy and science plan resumed after AMS Cooling System Repair EVA #1. Background data collection halted. |
2019-11-15 |
2019-319 |
10:41:02 |
Stowed NICER for AMS EVA #1. Background data collection begins. |
2019-11-12 |
2019-316 |
02:30:01 |
NICER Limit checker action point 48 (DI:ST|GPS reports data invalid) failed putting NICER is safe mode (AZ=0, EL=-90). Further analysis showed GPS SPS was invalid for more than 5 minutes. +Z antenna had 4 GPS signals but -Z antenna had none. This was most likely due to blockage due to ROBO Dextre arm being parked close to NICER after MISSE MSC extract/install operations. |
2019-11-12 |
2019-316 |
00:23:18 |
Redeploy and science plan resumed after ROBO Ops Day 4 for MISSE conclude for the day. Background data collection halted. |
2019-11-11 |
2019-315 |
12:09:38 |
Stow for MISSE MSC Transfer Operations by ROBO Day 4 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-10 |
2019-314 |
22:15:01 |
Redeploy and science plan resumed after ROBO Ops Day 3 for MISSE conclude for the day. Background data collection halted. |
2019-11-10 |
2019-314 |
12:17:48 |
Stow for MISSE MSC Transfer Operations by ROBO Day 3 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-10 |
2019-314 |
06:40:24 |
Redeploy and science plan resumed after ROBO Ops Day 2 for MISSE conclude for the day. Background data collection halted. |
2019-11-09 |
2019-313 |
07:58:14 |
Redeploy and science plan resumed after ROBO Ops for MISSE conclude for the day. Background data collection halted. |
2019-11-09 |
2019-313 |
12:17:01 |
Stow for MISSE MSC Transfer Operations by ROBO Day 2 - Note: ROBO was in their MSC Transfer Park Position since which obscured many NICER observations. Background data collection begins. |
2019-11-08 |
2019-312 |
12:47:59 |
Stow for MISSE MSC Transfer Operations by ROBO - Note: ROBO was in their MSC Transfer Park Position since 311/22:40 which obscured many NICER observations. Background data collection begins. |
2019-10-19 |
2019-292 |
17:13:00 |
Reactivation and Redeploy. Back on Science Plan |
2019-10-18 |
2019-291 |
NaN |
Battery Charge/Discharge Unit EVA |
2019-10-13 |
2019-286 |
11:19:00 |
Stopped Science Plan for Stow and Deactivation for RPCM R&R and Battery EVA - Survival heaters were still powered. |
2019-10-13 |
2019-286 |
03:15:00 |
Turned on NICER Pre-heaters in prep for extended power off |
2019-10-09 |
2019-282 |
12:26:00 |
Returned to Target Pointing |
2019-10-09 |
2019-282 |
11:45:00 |
Went to Joint Angle Mode to point away from Freon Venting |
2019-09-26 |
2019-269 |
08:06:00 |
OPM to +XVV with Profile 7 |
2019-09-25 |
2019-268 |
08:53:00 |
OPM to -XVV with Profile 2 |
2019-09-24 |
2019-267 |
00:51:00 |
ISS POR took out power to ELC-2 and ELC-4 and MISSE. NICER was completely powered off - Science downtime from 2019-267-00:51:45 - 2019-267-04:38:51 |
2019-09-20 |
2019-263 |
10:54:00 |
NICER MEB Processor Reset (during SAA passage) Induced Safe Mode - Science downtime 2019-263-10:54:55 to 2019-263-15:06:10 |
2019-09-09 |
2019-252 |
17:36:00 |
Reset the Star Tracker because imaging was stuck |
2019-08-29 |
2019-241 |
04:07:55 |
NICER background data collection ended and NICER re-deployed after ROBO MBSU IFM Ops. Since Plan resumed at 241-05:00:47 |
2019-08-28 |
2019-240 |
09:08:25 |
NICER science plan stopped, background data collection started and NICER STOW operations performed for ROBO Ops for MBSU IFM. |
2019-08-27 |
2019-239 |
14:42:00 |
Dragon-18 Release |
2019-08-27 |
2019-239 |
11:25:00 |
Dragon-18 Unberth |
2019-08-23 |
2019-235 |
05:01:00 |
OPM to -XVV with Profile 1 - Soyuz 60S docking at 2019-236-05:30 was aborted due to (presumed) issue with the KURS docking system amplifier onboard ISS in the RS segment.\n\nSoyuz placed at a safe trajectory from the ISS until further attempt is made to dock again. ISS currently flying in -XVV TEA orientation and no additional maneuvering is expected until re planning has happened.\n\nNICER plan was updated since the ISS maneuver after the docking was not performed to account for the non-change in attitude of the ISS. Also, AP 66 and 67 (solar exclusion) were disabled until maneuvering is completed in coming days. |
2019-08-15 |
2019-227 |
15:25:48 |
Reset GEONS clock bias which includes updated Earth Orientation Parameters |
2019-08-15 |
2019-227 |
16:34:01 |
NICER performed several Crab Pulsar observations during Night to Day transitions |
2019-08-01 |
2019-213 |
03:25:01 |
OPM to +XVV with Profile 6 |
2019-07-31 |
2019-212 |
05:46:01 |
OPM to -XVV with Profile 2 |
2019-07-27 |
2019-208 |
15:21:00 |
SpaceX-18 Install Thruster Disable |
2019-07-27 |
2019-208 |
14:00:00 |
Dragon-18 Capture |
2019-07-23 |
2019-204 |
21:11:27 |
Power cycled MPU-2 to clear an timestamping issue seen in science data |
2019-07-22 |
2019-203 |
04:00:00 |
CMG Maneuver to +XVV Yaw Bias Attitude |
2019-07-22 |
2019-203 |
01:12:17 |
NICER enters Pointing Control Safe Mode (AZ=0, EL=90). Due to ISS manuever from -XVV to +XVV, GPS SPS went invalid for greater than 5 minutes, triggering AP 48 calling RTS 30 to safe NICER. |
2019-07-22 |
2019-203 |
00:27:01 |
OPM to +XVV |
2019-07-14 |
2019-195 |
06:20:00 |
CMG Maneuver to -XVV Yaw Bias Attitude |
2019-07-14 |
2019-195 |
01:45:00 |
OPM to -XVV with Profile 1 |
2019-07-13 |
2019-194 |
19:30:00 |
CMG Maneuver to +XVV TEA |
2019-07-12 |
2019-193 |
18:10:00 |
CMG Maneuver to Yaw Bias Attitude |
2019-07-08 |
2019-189 |
14:18:00 |
MPU-2 time-stamping corrupt due to stuck bit. |
2019-06-19 |
2019-170 |
05:58:24 |
Background Data Collection Ends and NICER Re-deploy started |
2019-06-18 |
2019-169 |
12:36:23 |
Background Science Data Collection Begins |
2019-06-18 |
2019-169 |
11:47:49 |
NICER Science Plan stopped and Stow begins for ROBO Ops and MISSE troubleshooting. About 20% of targets were obscured prior to stopping the plan due to ROBO parked in our way over night 168-169. |
2019-06-13 |
2019-164 |
18:44:00 |
NICER science data collection begins |
2019-06-13 |
2019-164 |
17:53:57 |
NICER background data collection stopped and Unstow Begun |
2019-06-13 |
2019-164 |
11:52:10 |
NICER STOW Complete and Background Data Collection begun |
2019-06-13 |
2019-164 |
11:00:05 |
NICER STOW for ROBO Ops Started |
2019-06-03 |
2019-154 |
16:00:00 |
SpX-17 Release |
2019-05-24 |
2019-144 |
06:20:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-23 |
2019-143 |
18:50:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-23 |
2019-143 |
11:45:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-21 |
2019-141 |
15:30:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-20 |
2019-140 |
21:00:00 |
ISS Beta Gimbal Assembly on Solar Array 2B on the Port SARJ is stuck and will likely be parked overnight |
2019-05-17 |
2019-137 |
05:30:00 |
CMG MM Maneuver from Yaw Bias to Stage TEA |
2019-05-16 |
2019-136 |
17:55:21 |
NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 18:03:28. |
2019-05-16 |
2019-136 |
03:40:00 |
CMG MM Maneuver to Yaw Bias |
2019-05-14 |
2019-134 |
16:28:35 |
NICER science plan paused and slewing to take images of XCOM. Back to nominal timeline at 16:37:40. |
2019-05-06 |
2019-126 |
11:00:00 |
SpaceX-17 Capture |
2019-05-02 |
2019-122 |
12:59:53 |
NICER survival heater service is powered back on by HOSC |
2019-04-29 |
2019-119 |
22:13:00 |
NICER pre-heaters turned off |
2019-04-29 |
2019-119 |
20:51:00 |
NICER pre-heaters turned on |
2019-04-29 |
2019-119 |
17:35:00 |
NICER pre-heaters turned off |
2019-04-29 |
2019-119 |
15:13:00 |
NICER pre-heaters turned on |
2019-04-29 |
2019-119 |
12:00:00 |
ISS testing caused NICER survival heater service power off |
2019-04-26 |
2019-116 |
23:59:26 |
NICER science targetting resumed |
2019-04-26 |
2019-116 |
20:00:11 |
NICER powered on |
2019-04-24 |
2019-114 |
14:52:00 |
NICER powered off |
2019-04-24 |
2019-114 |
13:26:44 |
NICER Science targetting stopped for stowage for ROBO MISSE Ops. |
2019-04-11 |
2019-101 |
12:42:46 |
RRM3 at ELC-1 had a burst disk rupture venting gas and ice. Solar arrays were locked in a position to minimize impact. Venting induced an ISS roll of 1.3 degrees which was corrected at 12:44. Ice buildup on the exterior of the payload continued to break away at 14:03. |
2019-04-08 |
2019-098 |
17:55:00 |
NICER MEB Powered on |
2019-04-08 |
2019-098 |
09:47:00 |
NICER Science targetting stopped for stowage |
2019-04-08 |
2019-098 |
11:10:00 |
NICER Stowed and powered off |
2019-04-08 |
2019-098 |
20:30:00 |
NICER Science targetting resumed |
2019-04-05 |
2019-095 |
17:23:00 |
SPDM NiH R&R Operations |
2019-04-05 |
2019-095 |
02:15:00 |
RS OPM to +XVV (Yaw back to +356) |
2019-04-04 |
2019-094 |
04:41:00 |
OPM (Pitch to +359.7) |
2019-04-04 |
2019-094 |
03:04:00 |
OPM to -XVV (Yaw to +177, Pitch to +0.1) |
2019-03-15 |
2019-074 |
11:22:01 |
OPM to +XVV (back to +356 Yaw) |
2019-03-15 |
2019-074 |
01:10:00 |
ISS Maneuver to Post Docking (Pitch +359) |
2019-03-14 |
2019-073 |
16:53:01 |
ISS Maneuver to TEA +.4 Pitch) |
2019-03-14 |
2019-073 |
15:51:01 |
OPM to -XVV (Yaw +356to +177 for Soyuz Docking) |
2019-03-08 |
2019-067 |
07:31:04 |
SpaceX Demo-1 Dragon Undocking |
2019-03-03 |
2019-062 |
11:00:00 |
SpaceX Demo-1 Dragon docking to PMA2 |
2019-02-22 |
2019-053 |
06:57:00 |
NICER powered back on after MISSE Ops complete |
2019-02-22 |
2019-053 |
10:50:00 |
NICER back on Science plan. |
2019-02-21 |
2019-052 |
16:28:00 |
NICER stowed and powered off for ROBO ops |
2019-02-21 |
2019-052 |
15:09:33 |
NICER Targeting stopped for ROBO Ops to troubleshoot MISSE |
2019-02-15 |
2019-046 |
15:25:00 |
Reset GEONS as part of clock bias reset (NICER was using SPS during 15:27 to 15:32) |
2019-02-06 |
2019-037 |
18:25:00 |
FSW Flash Images 5, 6 and 7 TMR checks |
2019-02-06 |
2019-037 |
19:04:32 |
Updated GEONS EOP per Day 036. |
2019-02-04 |
2019-035 |
14:15:01 |
Reset the Star Tracker because imaging was stuck |
2019-01-28 |
2019-028 |
?? |
PRO performed a cold reset of the ELC coldfire processor for mISSE troubleshooting which resulted in a brief interruption of 1553 traffic for NICER |
2019-01-13 |
2019-013 |
23:30:00 |
SpaceX 16 Release |
2019-01-13 |
2019-013 |
18:50:00 |
SpaceX 16 Unberth |
2019-01-04 |
2019-004 |
09:59:00 |
NICER back on Science plan. |
2019-01-04 |
2019-004 |
06:38:00 |
NICER Powered back on after ROBO Ops complete |
2019-01-03 |
2019-003 |
01:56:00 |
NICER Powered off for ROBO Ops. |
2019-01-03 |
2019-003 |
00:56:00 |
NICER background data collection stopped. |
2019-01-02 |
2019-002 |
23:45:00 |
NICER stowed and collecting background data |
2019-01-02 |
2019-002 |
22:30:00 |
NICER Targeting stopped for ROBO Ops to install MSCs to MISSE. |
2018-12-21 |
2018-355 |
20:39:00 |
XNAV App configuration update |
2018-12-19 |
2018-353 |
22:01:00 |
XNAV App configuration update and restart |
2018-12-19 |
2018-353 |
20:20:00 |
ISS Maneuver to TEA |
2018-12-18 |
2018-352 |
15:56:00 |
GEONS EOP Updated |
2018-12-18 |
2018-352 |
10:30:00 |
ISS Manuever to Yaw Bias Attitude |
2018-12-17 |
2018-351 |
16:16:00 |
XNAV App configuration update and restart |
2018-12-13 |
2018-347 |
16:59:00 |
XNAV App configuration update |
2018-12-11 |
2018-345 |
18:15:00 |
Russian EVA 45A on Soyuz Module (they hacked the thing to pieces, debris everywhere!) Messed up our tracking. NICER off targetting plan from 345-18:57 - 23:58. |
2018-12-08 |
2018-342 |
12:21:00 |
SpaceX-16 Dragon Capture |
2018-12-08 |
2018-342 |
08:25:00 |
ISS Manuever to Dragon Capture Attitude |
2018-12-07 |
2018-341 |
21:25:00 |
XNAV App configuration update and restart |
2018-12-04 |
2018-338 |
18:19:00 |
XNAV App configuration update and restart |
2018-12-04 |
2018-338 |
04:07:00 |
ISS Manuever to +XVV using OPM |
2018-12-04 |
2018-338 |
02:45:00 |
ISS Maneuver to -XVV OPM Starting Attitude |
2018-12-03 |
2018-337 |
19:01:00 |
XNAV App configuration update and restart |
2018-12-03 |
2018-337 |
17:42:00 |
ISS Maneuver to Post-Docking LVLH TEA |
2018-12-03 |
2018-337 |
06:30:00 |
ISS Maneuver to -XVV using OPM for Soyuz docking |
2018-12-03 |
2018-337 |
15:40:00 |
ISS Maneuver to 57S Docking Attitude |
2018-11-29 |
2018-333 |
21:42:00 |
XNAV App configuration update and restart |
2018-11-26 |
2018-330 |
17:12:00 |
XNAV App configuration update and restart |
2018-11-19 |
2018-323 |
14:49:00 |
NICER payload rebooted by HOSC in error (Science outage of 3 hours and 26 minutes) recovery complete at 323-18:11:58 |
2018-11-19 |
2018-323 |
10:57:00 |
ISS Manuever to Cygnus Berthed TEA |
2018-11-19 |
2018-323 |
08:20:00 |
ISS Maneuver to Cygnus Capture Attitude |
2018-11-15 |
2018-319 |
21:35:00 |
XNAV App configuration update and restart in Calibration Mode |
2018-11-13 |
2018-317 |
17:54:00 |
XNAV App restart |
2018-11-09 |
2018-313 |
22:01:00 |
XNAV App configuration update and restart |
2018-11-07 |
2018-311 |
14:20:00 |
XNAV App restart |
2018-11-05 |
2018-309 |
15:29:00 |
XNAV App configuration update and restart |
2018-11-03 |
2018-307 |
12:24:00 |
MEB Processor Reset Induced Safe Mode Downtime 12:24:55 to 17:22:02z |
2018-11-01 |
2018-305 |
20:07:00 |
XNAV App configuration update |
2018-10-26 |
2018-299 |
14:53:00 |
XNAV App configuration update |
2018-10-22 |
2018-295 |
17:35:00 |
Resumed nominal science targeting and photo shoot concludes |
2018-10-22 |
2018-295 |
16:48:00 |
XNAV App restart |
2018-10-22 |
2018-295 |
15:49:00 |
XNAV App configuration update |
2018-10-22 |
2018-295 |
16:01:00 |
Suspended nominal science targeting and maneuvered NICER for high-def photo opportunities with CRONUS NICER also took pictures of ELC-3 area using star tracker. |
2018-10-22 |
2018-295 |
17:59:00 |
XNAV App restart |
2018-10-18 |
2018-291 |
18:10:00 |
Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters |
2018-10-18 |
2018-291 |
18:01:00 |
XNAV App restart |
2018-10-16 |
2018-289 |
19:53:00 |
XNAV App configuration update and restart |
2018-10-15 |
2018-288 |
17:16:00 |
XNAV App configuration update and restart |
2018-10-12 |
2018-285 |
23:02:00 |
ISS maneuvers to +XVV using OPM |
2018-10-12 |
2018-285 |
14:38:00 |
XNAV App configuration update |
2018-10-11 |
2018-284 |
02:13:00 |
ISS maneuvers to -XVV |
2018-10-05 |
2018-278 |
19:25:00 |
XNAV App configuration update |
2018-10-02 |
2018-275 |
17:22:00 |
XNAV App configuration update and restart |
2018-10-01 |
2018-274 |
15:58:00 |
XNAV App restart |
2018-09-25 |
2018-268 |
17:49:00 |
XNAV App restart |
2018-09-24 |
2018-267 |
14:52:00 |
XNAV App configuration update and restart |
2018-09-15 |
2018-260 |
19:21:00 |
XNAV App restart |
2018-09-14 |
2018-257 |
21:50:00 |
XNAV App configuration update and restart |
2018-09-11 |
2018-254 |
17:39:00 |
XNAV App configuration update and restart |
2018-09-06 |
2018-249 |
14:54:00 |
XNAV App configuration update and restart |
2018-09-05 |
2018-248 |
17:13:00 |
XNAV App restart |
2018-09-04 |
2018-247 |
21:18:00 |
XNAV App configuration update and restart |
2018-09-04 |
2018-247 |
14:45:00 |
Reset GEONS clock bias and GEONS which includes updated Earth Orientation Parameters |
2018-08-30 |
2018-242 |
15:02:00 |
XNAV App configuration update and restart |
2018-08-30 |
2018-242 |
09:45:00 |
Leak in Soyuz 55 module "fixed" |
2018-08-29 |
2018-241 |
09:45:00 |
Leak in Soyuz 55 module. Attitude (pitch) divergences. |
2018-08-24 |
2018-236 |
19:44:00 |
XNAV App configuration update and restart |
2018-08-21 |
2018-233 |
14:36:00 |
Performed Flash Memory TMR checks. |
2018-08-21 |
2018-233 |
14:19:00 |
XNAV App restart |
2018-08-21 |
2018-233 |
14:17:00 |
XNAV App configuration update |
2018-08-21 |
2018-233 |
13:56:00 |
Updated Earth Orientation Parameters |
2018-08-17 |
2018-229 |
19:17:00 |
XNAV App configuration update and restart |
2018-08-09 |
2018-221 |
18:50:00 |
XNAV App configuration update and restart |
2018-08-03 |
2018-215 |
16:37:00 |
Space-X CRC-15 Dragon released from ISS |
2018-08-01 |
2018-213 |
20:13:00 |
XNAV App configuration update |
2018-07-30 |
2018-211 |
13:38:00 |
Performed maintenance on flash memory partition |
2018-07-27 |
2018-208 |
21:19:00 |
XNAV App restart, now running in CAL mode |
2018-07-27 |
2018-208 |
21:17:00 |
XNAV App configuration update |
2018-07-27 |
2018-208 |
21:20:00 |
Performed Flash Memory TMR checks. Boot6.bin had TMR errors as did several of the spares. |
2018-07-26 |
2018-207 |
16:10:00 |
69P at SM Aft reboost |
2018-07-26 |
2018-207 |
17:38:00 |
XNAV App configuration update and restart |
2018-07-24 |
2018-205 |
20:21:00 |
Reset GEONS and GEONS Clock bias and updated EOP. GEONS had diverged at 18:14 |
2018-07-23 |
2018-204 |
01:45:00 |
Yaw Bias Manuever |
2018-07-21 |
2018-202 |
NaN |
ISS DCSU 3A Power on Reset, disrupting power service to J3AB (NICER survival heater and Op heater power service). POIC powered NICER pre-heaters in response. J3AB down for 8+ hours, minimal impact to NICER) |
2018-07-20 |
2018-201 |
20:40:00 |
XNAV App restart, now running in CAL mode |
2018-07-20 |
2018-201 |
20:38:00 |
XNAV App configuration update |
2018-07-18 |
2018-199 |
13:00:00 |
Maneuver to TEA |
2018-07-17 |
2018-198 |
22:04:00 |
XNAV App restart |
2018-07-17 |
2018-198 |
19:35:00 |
XNAV App configuration update |
2018-07-15 |
2018-196 |
12:35:00 |
Cygnus-9 Unberth and Release |
2018-07-15 |
2018-196 |
17:00:00 |
Yaw Bias Manuever |
2018-07-13 |
2018-194 |
18:56:00 |
XNAV App configuration update and restart |
2018-07-11 |
2018-192 |
02:09:00 |
OPM to +XVV |
2018-07-10 |
2018-191 |
02:04:00 |
ISS Maneuver to Post-Docking LVLH TEA |
2018-07-10 |
2018-191 |
01:39:00 |
70P Progress 2-Orbit Docking to DC-1 Nadir |
2018-07-10 |
2018-191 |
19:25:00 |
Cygnus Reboost Maneuver |
2018-07-10 |
2018-191 |
20:45:00 |
Cygnus Reboost Maneuver to -XVV TEA |
2018-07-09 |
2018-190 |
23:29:00 |
ISS Yaw and Pitch Maneuver (+180 Yaw and +90 Pitch) |
2018-07-09 |
2018-190 |
17:21:00 |
XNAV App configuration update |
2018-07-09 |
2018-190 |
04:05:00 |
ISS Pitch Maneuver (+359 to +0.5) |
2018-07-09 |
2018-190 |
02:16:00 |
OPM to -XVV (Yaw +354 to +175 for Progress Docking) |
2018-07-03 |
2018-184 |
22:01:00 |
XNAV App configuration update |
2018-07-02 |
2018-183 |
15:02:00 |
XNAV App restart |
2018-07-02 |
2018-183 |
10:57:00 |
SpaceX-15 Capture |
2018-06-29 |
2018-180 |
13:42:00 |
Reset GEONS and GEONS Clock bias and updated EOP |
2018-06-29 |
2018-180 |
20:54:00 |
XNAV App restart |
2018-06-29 |
2018-180 |
19:32:00 |
XNAV App configuration update |
2018-06-29 |
2018-180 |
13:55:00 |
Performed TMR checks on Flash image 6 and 7 - no errors found |
2018-06-26 |
2018-177 |
16:00:00 |
XNAV App restart |
2018-06-26 |
2018-177 |
15:54:00 |
XNAV App configuration update |
2018-06-25 |
2018-176 |
14:35:00 |
NICER back in Science Mode |
2018-06-25 |
2018-176 |
14:31:00 |
NICER PC commanded back to Ops Mode |
2018-06-25 |
2018-176 |
13:45:00 |
NICER PC Safe due to FDC |
2018-06-23 |
2018-174 |
08:15:00 |
69P Reboost |
2018-06-21 |
2018-172 |
14:56:00 |
XNAV App configuration update and restart |
2018-06-15 |
2018-166 |
18:50:00 |
XNAV App configuration update |
2018-06-15 |
2018-166 |
17:30:00 |
XNAV App restart |
2018-06-14 |
2018-165 |
09:32:00 |
N2 EWC EVA |
2018-06-12 |
2018-163 |
17:13:00 |
XNAV App configuration update and restart |
2018-06-08 |
2018-159 |
15:30:00 |
XNAV App configuration update and restart |
2018-06-08 |
2018-159 |
13:07:00 |
55S Soyuz Docking on MRM-1 |
2018-06-06 |
2018-157 |
15:18:00 |
XNAV App restart |
2018-06-04 |
2018-155 |
17:34:00 |
XNAV App configuration update and restart |
2018-06-03 |
2018-154 |
09:16:00 |
53S Soyuz undocking |
2018-06-03 |
2018-154 |
09:29:00 |
Manevuer to post-53S undocking attitude |
2018-06-01 |
2018-152 |
20:56:00 |
XNAV App restart |
2018-05-30 |
2018-150 |
17:04:00 |
XNAV App configuration update and restart |
2018-05-24 |
2018-144 |
09:20:00 |
OA9 Cygnus Capture (attitude man at 07:20) |
2018-05-24 |
2018-144 |
18:45:00 |
XNAV App configuration update and restart |
2018-05-22 |
2018-142 |
15:52:00 |
XNAV App restart |
2018-05-21 |
2018-141 |
14:32:00 |
XNAV App configuration update and restart |
2018-05-17 |
2018-137 |
14:15:00 |
XNAV App configuration update and restart |
2018-05-16 |
2018-136 |
22:57:00 |
XNAV App Restarted |
2018-05-16 |
2018-136 |
22:56:00 |
NICER resumes targeting |
2018-05-16 |
2018-136 |
21:50:00 |
NICER Deloyed |
2018-05-16 |
2018-136 |
18:40:00 |
NICER Powered on |
2018-05-16 |
2018-136 |
17:30:00 |
PFCS EVA complete |
2018-05-16 |
2018-136 |
14:21:00 |
NICER Powered off |
2018-05-16 |
2018-136 |
10:15:00 |
NICER Stow complete |
2018-05-16 |
2018-136 |
09:02:00 |
NICER targeting stopped |
2018-05-16 |
2018-136/137 |
NaN |
PFCS EVA |
2018-05-14 |
2018-134 |
15:27:00 |
XNAV App configuration update and restart |
2018-05-12 |
2018-132 |
22:07:00 |
69P Reboost |
2018-05-09 |
2018-128 |
17:20:00 |
XNAV App configuration update and restart |
2018-05-08 |
2018-128 |
20:47:00 |
FSW Flash Images 6 and 7 TMR checks (none found) |
2018-05-07 |
2018-127 |
17:51:00 |
Updated GPS EOP |
2018-05-05 |
2018-125 |
13:24:00 |
SpaceX 14 Release |
2018-05-04 |
2018-124 |
23:17:00 |
SpaceX 14 Unberth Maneuver |
2018-05-04 |
2018-124 |
20:17:00 |
Updated XNAV app config and restarted |
2018-05-01 |
2018-121 |
15:26:00 |
Updated XNAV app config and restarted |
2018-04-27 |
2018-117 |
NaN |
MISSE Robotics Day 7 |
2018-04-26 |
2018-116 |
18:56:00 |
XNAV App configuration update and restart |
2018-04-26 |
2018-116 |
18:42:00 |
XNAV App configuration update |
2018-04-26 |
2018-116 |
NaN |
MISSE Robotics Day 6 |
2018-04-24 |
2018-114 |
14:52:00 |
Employing new RTSs to allow modified detector configuration for SCO-X1 observations starting at 15:14. |
2018-04-24 |
2018-114 |
17:36:00 |
XNAV App configuration update |
2018-04-23 |
2018-113 |
21:46:00 |
Reset XNAV app |
2018-04-23 |
2018-113 |
14:12:00 |
Reset XNAV app |
2018-04-20 |
2018-110 |
18:26:00 |
Updated XNAV app config and restarted |
2018-04-19 |
2018-109 |
23:06:00 |
NICER Reactivated and Redeployed after MISSE MSC installation. MEB on at 109-23:20. Began NICER observations at 110-02:00. |
2018-04-19 |
2018-109 |
NaN |
MISSE Robotics Day 5 |
2018-04-19 |
2018-110 |
03:20:00 |
XNAV App reconfigured and running. Reset performed at 04:02. |
2018-04-18 |
2018-108 |
16:50:00 |
NICER powered off for MISSE MSC activities. MPUs off at 16:58. MEB off at 17:02. |
2018-04-18 |
2018-108 |
NaN |
MISSE Robotics Day 4 |
2018-04-18 |
2018-108 |
10:50:00 |
69P Reboost |
2018-04-18 |
2018-108 |
06:12:00 |
NICER powered on after MISSE activities complete to collect background data. NICER still stowed. - MEB back on at 06:23. MPUs back on at 07:14. |
2018-04-17 |
2018-107 |
17:09:00 |
NICER powered off for MISSE MSC installation activities - MPUs off at 17:14, MEB off at 17:25 |
2018-04-17 |
2018-107 |
13:40:00 |
Science observations suspended. Begin to stow for MISSE MSC installation activities. ROBO arm blocking NICER FOV hours before this. |
2018-04-17 |
2018-107 |
NaN |
MISSE Robotics Day 3 |
2018-04-16 |
2018-106 |
NaN |
MISSE Robotics Day 2 |
2018-04-15 |
2018-105 |
NaN |
MISSE Robotics Day 1 |
2018-04-13 |
2018-103 |
20:00:00 |
Reset XNAV app |
2018-04-13 |
2018-103 |
21:28:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-04-12 |
2018-102 |
15:37:00 |
Reset XNAV app |
2018-04-10 |
2018-100 |
18:35:00 |
Updated XNAV app config and restarted |
2018-04-09 |
2018-099 |
08:33:00 |
XNAV App started |
2018-04-09 |
2018-099 |
07:40:00 |
NICER began science observations after MISSE-FF installation |
2018-04-09 |
2018-099 |
04:47:00 |
NICER powered on |
2018-04-08 |
2018-098 |
18:11:00 |
NICER powered off |
2018-04-08 |
2018-098 |
15:50:00 |
Terminated NICER science observations and began stow and deactivation for MISSE-FF installation |
2018-04-04 |
2018-094 |
14:47:00 |
SpaceX-14 Berth |
2018-04-04 |
2018-094 |
11:00:00 |
SpaceX-14 Capture |
2018-04-03 |
2018-093 |
16:18:00 |
Updated XNAV app config and restarted |
2018-03-30 |
2018-089 |
17:56:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-03-29 |
2018-088 |
11:10:00 |
N3 EWC EVA |
2018-03-28 |
2018-087 |
15:33:00 |
Updated GPS GEONS EOP |
2018-03-28 |
2018-087 |
13:50:30 |
Progress Vehicle (68P) undocking from DC-1 |
2018-03-27 |
2018-086 |
NaN |
Began SEXTANT-driven operations for NICER |
2018-03-26 |
2018-085 |
16:03:00 |
Unexpected ISS Ku-Comm unit reset causing a permanent NICER data loss from 16:17 - 16:42. |
2018-03-26 |
2018-085 |
14:21:00 |
Updated XNAV app config and restarted |
2018-03-26 |
2018-085 |
17:19:00 |
Reset XNAV app |
2018-03-25 |
2018-084 |
13:15:00 |
Manuever to SARJ Parked TEA for 68P Prop Purge |
2018-03-24 |
2018-083 |
06:10:00 |
Manuever OPM to +XVV |
2018-03-23 |
2018-082 |
19:32 to 19:43 |
Series of commanded NICER ST resets which left PC in safe mode. Safe mode exited at 19:43. |
2018-03-23 |
2018-082 |
07:10:00 |
Maneuver OPM to -XXV for 54S Docking |
2018-03-23 |
2018-082 |
19:40:00 |
54S Docking |
2018-03-22 |
2018-081 |
18:59:00 |
Updated XNAV app config and restarted |
2018-03-19 |
2018-078 |
18:20:00 |
Updated XNAV app config and restarted |
2018-03-14 |
2018-073 |
14:44:00 |
Reset XNAV app |
2018-03-13 |
2018-072 |
21:27:00 |
Updated XNAV app config and restarted |
2018-03-13 |
2018-072 |
20:45:00 |
69P Reboost |
2018-03-12 |
2018-071 |
20:43:00 |
Reset XNAV app |
2018-03-09 |
2018-068 |
21:09:00 |
Updated XNAV app config and restarted |
2018-03-06 |
2018-065 |
NaN |
XNAV App ran in opportunistic mode observing PSR_B1937+21 |
2018-03-05 |
2018-064 |
19:59:00 |
MPU-5 Powered off due to overcurrent trip on PDB board. MPU recovery complete at ~ 22:30. |
2018-02-27 |
2018-058 |
23:08:00 |
52S Undocking from MRM2 |
2018-02-22 |
2018-053 |
19:14:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-02-22 |
2018-053 |
08:52:00 |
52S Thruster Test on MM |
2018-02-16 |
2018-047 |
19:11:00 |
Restarted XNAV app after halting it in December 2017 |
2018-02-16 |
2018-047 |
NaN |
POA LEE Swap US EVA |
2018-02-15 |
2018-046 |
10:43:00 |
69P Docking to SM-Aft |
2018-02-13 |
2018-044 |
17:56:00 |
Reset GEONS and clock bias |
2018-02-02 |
2018-033 |
NaN |
RS EVA 44 |
2018-01-30 |
2018-030 |
14:40:00 |
SM Reboost |
2018-01-30 |
2018-030 |
17:11:00 |
Performed a TMR check of current FSW images in FLASH. No TMR errors. |
2018-01-23 |
2018-023 |
NaN |
LEE B R&R US EVA |
2018-01-18 |
2018-018 |
15:19:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-01-17 |
2018-017 |
20:15:00 |
SM Main Engine Reboost |
2018-01-13 |
2018-013 |
10:00:00 |
SpX-13 Unberth from N2-Nadir |
2018-01-09 |
2018-009 |
17:35:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2018-01-02 |
2018-002 |
17:05:00 |
TSIS at ELC-3 vented 1.5L of Argon from 17:05:38 to 17:10:00. |
2017-12-28 |
2017-362 |
01:03:00 |
67P Undocking from SM-Aft |
2017-12-27 |
2017-361 |
21:04:00 |
GEONS diverged (likely due to manuever on DOY 360 for Progress docking) Recovered GEONS at 361-21:37. |
2017-12-19 |
2017-353 |
08:43:00 |
53S Docking to MRM1 |
2017-12-17 |
2017-351 |
11:00:00 |
SpaceX-13 Capture N2-Nadir |
2017-12-15 |
2017-349 |
21:58:00 |
GEONS diverged (likely due to DOY 349 for Soyuz undocking) Recovered GEONS at 349-22:23 |
2017-12-14 |
2017-348 |
05:14:00 |
51S Undocking from MRM1 |
2017-12-12 |
2017-346 |
05:20:00 |
67P Prop Purge |
2017-12-08 |
2017-342 |
10:17:00 |
51S Thruster Test |
2017-12-06 |
2017-340 |
17:17:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2017-12-06 |
2017-340 |
13:12:00 |
OA8 Release from N1-Nadir |
2017-12-01 |
2017-335 |
21:12:00 |
Halted XNAV App |
2017-11-29 |
2017-333 |
15:50:00 |
67P Reboost |
2017-11-28 |
2017-332 |
18:31:00 |
XNAV App Restart |
2017-11-28 |
2017-332 |
18:29:00 |
XNAV App configuration update |
2017-11-22 |
2017-326 |
17:15:00 |
XNAV App configuration update |
2017-11-22 |
2017-326 |
17:51:00 |
51S Thruster Test |
2017-11-20 |
2017-324 |
20:29:00 |
XNAV App configuration update |
2017-11-20 |
2017-324 |
17:52:00 |
51S Thruster Test |
2017-11-20 |
2017-324 |
19:16:00 |
Reset GEONS and GEONS Clock bias and updated EOP |
2017-11-20 |
2017-324 |
20:49:00 |
Reset star tracker since it was stuck in mode where it would not store images. |
2017-11-20 |
2017-324 |
20:31:00 |
XNAV App Restart |
2017-11-16 |
2017-320 |
18:11:00 |
51S Thruster Test |
2017-11-14 |
2017-318 |
10:04:00 |
OA8 Capture at N1-Nadir |
2017-11-10 |
2017-314 |
20:10:00 |
51S Thruster Test |
2017-11-05 |
2017-309 |
01:59:00 |
NICER leaves PC Safe and returns to nominal operations. |
2017-11-04 |
2017-308 |
13:56:00 |
NICER Star Tracker Reset (likely due to SEU) causes NICER PC Safe |
2017-11-02 |
2017-306 |
03:15:00 |
67P Reboost |
2017-11-02 |
2017-306 |
18:37:00 |
MPU Detector thresholds for the Day 306 through 310 LMC-X1 targets were adjusted to be Nominal + 190 as follows:\n2017-306-18:37:20 | /FSW_SC_STARTRTS RTSID=228\n2017-306-23:19:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-02:24:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-07:04:00 | /FSW_SC_STARTRTS RTSID=228\n2017-307-10:10:40 | /FSW_SC_STARTRTS RTSID=228\n2017-307-11:43:20 | /FSW_SC_STARTRTS RTSID=228\n2017-307-17:56:40 | /FSW_SC_STARTRTS RTSID=228\n2017-308-00:10:47 | /FSW_SC_STARTRTS RTSID=228\n2017-308-01:40:38 | /FSW_SC_STARTRTS RTSID=228\n2017-308-03:13:22 | /FSW_SC_STARTRTS RTSID=228\n2017-308-04:46:02 | /FSW_SC_STARTRTS RTSID=228\n2017-308-09:32:54 | /FSW_SC_STARTRTS RTSID=228\n2017-308-12:33:49 | /FSW_SC_STARTRTS RTSID=228\n2017-308-21:54:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-00:59:54 | /FSW_SC_STARTRTS RTSID=228\n2017-309-02:28:41 | /FSW_SC_STARTRTS RTSID=228\n2017-309-04:02:18 | /FSW_SC_STARTRTS RTSID=228\n2017-309-07:10:34 | /FSW_SC_STARTRTS RTSID=228\n2017-309-08:43:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-13:21:14 | /FSW_SC_STARTRTS RTSID=228\n2017-309-14:53:37 | /FSW_SC_STARTRTS RTSID=228\n2017-310-00:09:54 | /FSW_SC_STARTRTS RTSID=228\n2017-310-01:42:34 | /FSW_SC_STARTRTS RTSID=228\n2017-310-03:16:35 | /FSW_SC_STARTRTS RTSID=228\n2017-310-07:53:14 | /FSW_SC_STARTRTS RTSID=228\n2017-310-11:01:55 | /FSW_SC_STARTRTS RTSID=228 |
2017-10-20 |
2017-293 |
NaN |
EVA 46 |
2017-10-16 |
2017-289 |
11:04:00 |
68P Docking to DC-1 Nadir |
2017-10-10 |
2017-283 |
NaN |
EVA CP9 R&R LEE Lube |
2017-10-05 |
2017-278 |
NaN |
EVA LEE A R&R |
2017-09-27 |
2017-270 |
16:50:00 |
67P Reboost |
2017-09-17 |
2017-260 |
08:40:00 |
SpaceX-12 Dragon Unberth |
2017-09-13 |
2017-256 |
02:55:00 |
Soyuz (52S) Docking to MRM2 |
2017-09-13 |
2017-256 |
14:46:00 |
Yaw Maneuver to +XVV (~90 minutes) for 52S |
2017-09-12 |
2017-255 |
17:08:00 |
Yaw Maneuver to -XVV (~90 minutes) for 52S |
2017-09-07 |
2017-250 |
14:20:00 |
Switched PPS source to GEONS |
2017-09-06 |
2017-249 |
18:46:00 |
Switched PPS source to SPS (due to Earth Orientation Parameters update) |
2017-09-02 |
2017-245 |
21:58:00 |
Soyuz (50S) Undocking from MRM2 |
2017-07-31 |
2017-226 |
14:46:00 |
SpaceX-12 Dragon Berth |
2017-07-31 |
2017-212 |
17:25:00 |
Rebooted the Star Tracker (MIRU quaternion was corrupted due to geons reset) |
2017-07-31 |
2017-212 |
17:21:00 |
Switched PPS source to GEONS |
2017-07-31 |
2017-212 |
16:51:00 |
Switched PPS source to SPS |
2017-07-31 |
2017-212 |
15:40:00 |
GEONS Reset (to reset GEONS clock bias) - had to repeat several times |
2017-07-29 |
2017-210 |
09:44:00 |
Yaw Maneuver to +XVV (~90 minutes) for 51S |
2017-07-28 |
2017-209 |
21:54:00 |
Soyuz (51S) Docking to MRM1 |
2017-07-28 |
2017-209 |
13:39:00 |
Yaw Maneuver to -XVV (~90 minutes) for 51S |
2017-07-21 |
2017-202 |
13:49:00 |
Switched PPS source to GEONS |
2017-07-20 |
2017-201 |
17:46:00 |
Progress Vehicle (66P) Undocking from DC1-Nadir |
2017-07-20 |
2017-201 |
19:59:00 |
Switched PPS source to SPS |
2017-07-18 |
2017-199 |
21:01:00 |
MPU-3 back in science mode |
2017-07-18 |
2017-199 |
20:40:00 |
MPU-3 was powered off due to likely SEU |
2017-07-02 |
2017-183 |
15:46:00 |
SpaceX-11 Dragon Unberth |
2017-07-01 |
2017-182 |
13:26:00 |
Switched to Science Mode 7 (photons and resets) all the time |
2017-06-28 |
2017-179 |
16:54:00 |
Switched PPS source to GEONS |
2017-06-28 |
2017-179 |
16:25:00 |
Switched PPS source to SPS |
2017-06-24 |
2017-175 |
23:09:00 |
Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing. |
2017-06-23 |
2017-174 |
21:52:00 |
Switched PPS source to GEONS |
2017-06-22 |
2017-173 |
18:37:00 |
Switched to Science Mode 1 (only photons) for Orbit Day and Mode 7 (photons and resets) for Orbit Night |
2017-06-21 |
2017-172 |
17:44:00 |
Tightened deadbands to 0.5 degrees on heaters for detector and concentrator plates (maintain at +5 deg C) |
2017-06-19 |
2019-170 |
06:45:12 |
NICER Re-deploy complete and Science Data Collection Begins (ROBO is parked in the NICER FOV until later today which will affect 20% of the targets) |
2017-06-18 |
2017-169 |
23:09:00 |
Adjusted pointing control parmeters (ST to XTI alignment quaternion) for better pointing. Actually started making adjustments at 11:52z. |
2017-06-18 |
2017-169 |
08:25:00 |
First intentional X-rays received from Scorpious-X1 |
2017-06-17 |
2017-168 |
12:34:00 |
Updated on-board sequence to keep the 4 known bad detectors disabled. |
2017-06-17 |
2017-167 |
11:50:00 |
Set the MPUs to Science Mode 1 (photons only) |
2017-06-16 |
2017-167 |
07:32:00 |
End of Dual threshold scan |
2017-06-16 |
2017-167 |
14:05:00 |
End of Dual threshold scan, run #2 |
2017-06-16 |
2017-167 |
00:02:00 |
Power-on ST |
2017-06-16 |
2017-167 |
00:06:00 |
Start of Dual threshold scan - stowed |
2017-06-16 |
2017-167 |
20:07:00 |
Range of Motion Completed |
2017-06-16 |
2017-167 |
11:42:00 |
Progress Vehicle (67P) Docking at SM-Aft |
2017-06-16 |
2017-167 |
13:15:00 |
Power-on GCE, prep for deployment |
2017-06-16 |
2017-167 |
10:01:00 |
Start of Dual threshold scan, run #2 - stowed |
2017-06-16 |
2017-167 |
14:10:00 |
Start of Deployment sequence |
2017-06-16 |
2017-167 |
14:30:00 |
First significant Deployment motion |
2017-06-16 |
2017-167 |
14:50:00 |
Deployment to heads down complete |
2017-06-16 |
2017-167 |
15:47:00 |
Deployment to heads up complete |
2017-06-16 |
2017-167 |
16:01:00 |
Range of Motion Started |
2017-06-15 |
2017-166 |
05:32:00 |
Frangibolt 2 released |
2017-06-15 |
2017-166 |
23:45:00 |
Enable Science (mode 7 - photons and resets) - stowed |
2017-06-15 |
2017-166 |
22:33:00 |
Power-on MPUs |
2017-06-15 |
2017-166 |
22:29:00 |
Power-on GPS |
2017-06-15 |
2017-166 |
21:37:00 |
Set Conc temp settings and Det temp setting to nominal (5 deg C), cooling down to operational temp |
2017-06-15 |
2017-166 |
04:12:00 |
Frangibolt 3 released |
2017-06-15 |
2017-166 |
20:19:00 |
Frangibolt 4 released |
2017-06-14 |
2017-165 |
08:13:00 |
NICER Activation/Power-on GCE |
2017-06-14 |
2017-165 |
08:26:00 |
Power-off GCE |
2017-06-14 |
2017-165 |
08:19:00 |
Latch |
2017-06-14 |
2017-165 |
14:16:00 |
Start Frangibolt release process |
2017-06-14 |
2017-165 |
08:06:00 |
NICER Activation/Enable science (mode 7 - phtons and resets) - Stowed |
2017-06-14 |
2017-165 |
06:38:00 |
NICER Activation/Power-on all MPUs |
2017-06-14 |
2017-165 |
06:32:00 |
NICER Activation/Power-on Star Tracker |
2017-06-14 |
2017-165 |
13:02:00 |
Power-off MPUs, prep for deployment |
2017-06-14 |
2017-165 |
04:28:00 |
NICER Activation/Power-on MEB |
2017-06-14 |
2017-165 |
16:00:00 |
Power-on GCE to check for frangibolt release |
2017-06-14 |
2017-165 |
16:07:00 |
Frangibolt 1 released |
2017-06-14 |
2017-165 |
22:00:00 |
Discretes 1 and 2 disabled to turn on pre-heaters |
2017-06-14 |
2017-165 |
22:42:00 |
Set Conc temp settings to 30 and Det temp setting to 20, warming up to actuate frangibolts again |
2017-06-14 |
2017-165 |
22:51:00 |
Power-off GCE |
2017-06-14 |
2017-165 |
22:52:00 |
Power-off ST |
2017-06-14 |
2017-165 |
22:53:00 |
Power-off GPS |
2017-06-14 |
2017-165 |
21:34:00 |
Discretes 1 and 2 enabled to turn off pre-heaters |
2017-06-14 |
2017-165 |
06:20:00 |
NICER Activation/Power-on GPS |
2017-06-13 |
2017-165 |
03:53:00 |
NICER Installation |
2017-06-11 |
2017-162 |
22:36:00 |
NICER Extraction |
2017-06-05 |
2017-156 |
17:46:00 |
SpaceX-11 Berth |
2017-06-03 |
2017-154 |
21:07:00 |
SpaceX-11 Launch |
NaT |
2018-183,186-189 |
NaN |
Space-X Robotics |